Skip to main content

Parsons wins award for Caldecott Tunnel

Parsons has won an award for its work on the Caldecott Fourth Bore Project. The award comes from Roads & Bridges magazine as the top (US) road project of 2013. Parsons worked as prime consultant on the US$417 million tunnel project, working with Jacobs Associates. The project involved constructing a fourth bore through the Berkeley Hills, near Oakland, California. Parsons was responsible for preliminary engineering and the final design of the tunnel, the operations building, and two associated roadway proje
November 8, 2013 Read time: 2 mins
3220 Parsons has won an award for ITS work on the Caldecott Fourth Bore Project. The award comes from Roads & Bridges magazine as the top (US) road project of 2013. Parsons worked as prime consultant on the US$417 million tunnel project, working with Jacobs Associates. The project involved constructing a fourth bore through the Berkeley Hills, near Oakland, California. Parsons was responsible for preliminary engineering and the final design of the tunnel, the operations building, and two associated roadway projects. The tunnel was excavated using sequential excavation, also known as the New Austrian Tunneling Method.

The Caldecott Fourth Bore Project represents a partnership between the 2410 Federal Highway Administration, the 2451 California Department of Transportation, the 7419 Metropolitan Transportation Commission, the Contra Costa Transportation Authority, and the Alameda County Transportation Commission. When it opens to traffic in late 2013, the Fourth Bore will relieve traffic congestion in the off-peak direction along a heavily traveled section of State Route 24 by permanently dedicating two bores to westbound traffic and two bores to eastbound traffic.  This multimillion-dollar project is one of the largest recipients of 1088 American Recovery and Reinvestment Act funding in the nation, a testament to ITS regional importance.

Related Content

  • Parsons wins award for tunnel project
    June 5, 2014
    Parsons has won the Project of the Year award for the Caldecott Tunnel Fourth Bore project. The tunnel was selected as Project of the Year by the California Transportation Foundation’s (CTF’s) 25th Annual Transportation Awards. The US$417 million tunnel has added two additional traffic lanes on State Route 24 through Berkeley Hills. The new tunnel links the cities of Oakland and Orinda and helps reduce congestion in the Bay Area, which is noted for its heavy traffic volumes. Parsons had responsibility for p
  • Parsons is handling a major interchange project in North Carolina
    June 21, 2017
    Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).
  • Texas route benefits from loan
    March 1, 2012
    Drivers in Texas using the SH161 route are set to benefit from a US$418 million loan being provided by the US Department of Transportation to complete work on the link.
  • Key Florida highway link wins major award
    July 2, 2014
    A major highway connection project located in Tampa, Florida has won a 2014 Outstanding Project Award from the Florida Department of Transportation (FDOT) and the Florida Institute of Consulting Engineers (FICE). The link was opened in January 2014 and was engineered by designer Atkins. The 1.6km-long I-4/Selmon Connector links I-4 with the Lee Roy Selmon Expressway. The US$425 million Connector now carries over 24,000 vehicles/day, which includes some 2,000 heavy vehicles/day. With the construction of the