Skip to main content

More investment needed for road maintenance

As the Northern Hemisphere recovers from yet another tough winter, the road system in many countries can be seen to have taken a heavy battering. Potholes abound in many countries, the legacy of cold weather, and this has been made worse by heavy rain that has caused widespread flooding and also damaged bridges.
March 13, 2014 Read time: 3 mins
As the Northern Hemisphere recovers from yet another tough winter, the road system in many countries can be seen to have taken a heavy battering. Potholes abound in many countries, the legacy of cold weather, and this has been made worse by heavy rain that has caused widespread flooding and also damaged bridges.

Part of the problem is one of the methods used for repair. Cheap, low quality repairs are common as a quick fix solution for damaged roads. But such construction methods often lead to early failures, costing significantly more in the long run. The cheap road repairs bring technical problems and many asphalt road surfaces fail due to moisture ingress at joints, with the freeze thaw process then breaking away the edgesand further repairs subsequently being needed.

But the problems of road maintenance go deeper than potholes. A recent report in the British press for instance suggested that some minor roads in the South West of England have been neglected for so long that they are almost beyond repair and may have to be abandoned. Maintenance has focussed on patching rather than on rebuilding the underlying base, with the result that the road structure is now beginning to give way and any surface repairs are unlikely to last long as they will fail from underneath.

Large temperature variations can cause major problems for road structures and surfaces and in Russia there has been some debate as to whether to use more concrete road construction methods. The failure of the asphalt surfaces on some major Russian highways prompted the authorities to consider concrete roads instead. Russia’s tough climate with its cold winters and hot summers certainly places enormous stresses on road surfaces, making material selection a tricky problem for designers and specifiers.

Both asphalt and concrete roads can be built to withstand the extremes of winter and summer climates. Techniques such as echelon paving can minimise the risk of joint failures in new asphalt surfaces, while joint heating can ensure that repairs last far longer. Hot-on-hot paving techniques can provide resilient surfaces with strong bonds between layers that will wear well despite heavy traffic volumes. Meanwhile machine control technologies and new surfacing techniques can optimise concrete road construction techniques and provide long-lasting roads that will perform far better in terms of skid resistance and road noise.

The technology to deliver longer lasting roads is available. But tight budgets mean that road authorities are skimping on their spending, storing up problems for the future.

Related Content

  • The cycle of potholes in the UK
    October 1, 2019
    Since 2015 almost a million potholes have been recorded annually by UK local authorities, with the 2016 count reaching 1,088,965, according to an insurance provider.
  • Cutting cracking of asphalt surfaces
    February 6, 2020
    The HUESKER Group says that it has a durable solution for asphalt reinforcement that can help combat road repair backlogs.
  • Securing safer transportation infrastructure through non-destructive technology
    June 16, 2014
    Kevin Vine reports on the use of non-destructive testing for structural analysis of bridges Seven years ago, the overpass collapse in Laval, Québec that led to the death of five people brought to light severe issues with the state of the country’s bridges and transportation infrastructure. More recently, a crack in the Champlain Bridge to Montreal that forced over 160,000 commuters to find alternate routes to work reaffirmed a need for greater emphasis on early detection before a crisis occurs.
  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is