Skip to main content

More investment needed for road maintenance

As the Northern Hemisphere recovers from yet another tough winter, the road system in many countries can be seen to have taken a heavy battering. Potholes abound in many countries, the legacy of cold weather, and this has been made worse by heavy rain that has caused widespread flooding and also damaged bridges.
March 13, 2014 Read time: 3 mins
As the Northern Hemisphere recovers from yet another tough winter, the road system in many countries can be seen to have taken a heavy battering. Potholes abound in many countries, the legacy of cold weather, and this has been made worse by heavy rain that has caused widespread flooding and also damaged bridges.

Part of the problem is one of the methods used for repair. Cheap, low quality repairs are common as a quick fix solution for damaged roads. But such construction methods often lead to early failures, costing significantly more in the long run. The cheap road repairs bring technical problems and many asphalt road surfaces fail due to moisture ingress at joints, with the freeze thaw process then breaking away the edgesand further repairs subsequently being needed.

But the problems of road maintenance go deeper than potholes. A recent report in the British press for instance suggested that some minor roads in the South West of England have been neglected for so long that they are almost beyond repair and may have to be abandoned. Maintenance has focussed on patching rather than on rebuilding the underlying base, with the result that the road structure is now beginning to give way and any surface repairs are unlikely to last long as they will fail from underneath.

Large temperature variations can cause major problems for road structures and surfaces and in Russia there has been some debate as to whether to use more concrete road construction methods. The failure of the asphalt surfaces on some major Russian highways prompted the authorities to consider concrete roads instead. Russia’s tough climate with its cold winters and hot summers certainly places enormous stresses on road surfaces, making material selection a tricky problem for designers and specifiers.

Both asphalt and concrete roads can be built to withstand the extremes of winter and summer climates. Techniques such as echelon paving can minimise the risk of joint failures in new asphalt surfaces, while joint heating can ensure that repairs last far longer. Hot-on-hot paving techniques can provide resilient surfaces with strong bonds between layers that will wear well despite heavy traffic volumes. Meanwhile machine control technologies and new surfacing techniques can optimise concrete road construction techniques and provide long-lasting roads that will perform far better in terms of skid resistance and road noise.

The technology to deliver longer lasting roads is available. But tight budgets mean that road authorities are skimping on their spending, storing up problems for the future.

Related Content

  • Road recycling saves time and costs, reduces emissions
    February 13, 2012
    Stabilisers bring recycling improvements to roads in the UK and Armenia. The local road authorities near the UK city of Bath have saved nearly €250,500 on the cost of repairing a 400m long section of the B3110 Midford Road. This saving has been achieved by opting to recycle and strengthen in-situ the existing surface, instead of using conventional full depth pavement reconstruction.
  • Bridge collapse on key I-5 route in Washington State
    June 24, 2013
    The news that a key highway bridge has collapsed in the US comes as gloomy reading for all in the highway sector. When a section of the Interstate 5 Bridge over the Skagit River in Washington failed in May 2013, a number of vehicles were plunged into the river. Luckily no-one was killed in the incident on the route, which is one of the main links between the US and Canada, and the parallel bridge was able to carry traffic, albeit with delays for users.
  • Bitumen technology suppliers seek new ways to save money and work more efficiently
    April 24, 2013
    When World Highways decided to ask some of the industry’s leading suppliers what the future holds for bitumen, we found out - not surprisingly in the current economic climate - that it’s all about saving money. Kristina Smith reports. How quickly the tide turns. Just two years ago, saving carbon and the planet was moving up many countries’ political agendas. Now politicians in Europe and beyond have been forced to park commitments in the face of economic austerity. “The big issue with local government is th
  • Cold recycling helps rebuild of Brazil’s Ayrton Senna highway
    September 28, 2015
    Brazil’s Ayrton Senna Highway has been rebuilt using cold recycling. Brazil’s SP-070 is also known as the Ayrton Senna Highway and is a major highway in the country, carrying heavy traffic volumes. For its rebuild, the time-saving, cost-efficient and eco-friendly benefits of the cold recycling process have been put to the test. The SP-070 provides a key transport link between São Paulo and Campos do Jordão, Vale do Paraíba and Rio de Janeiro, as well as being the main access route to Guarulhos Interna