Skip to main content

SU-820 reconstructing Russian federal highway M-5 Ural

Stroitelnoe Upravlenie-820 (SU-820) has won a tender for reconstructing 11km of the M-5 Ural federal highway in Russia. SU-820 estimated the work cost at US$103.98million (RUB 3.30bn), which was 18% less that the starting price. The reconstruction is due to be completed by late October 2014. Five other companies including the Chelyabinsk-based (Ural) Uralmotostroy, the Omsk-based (Siberia) Mostovik, and the Saratov-based (Volga) Volgomost, took part in the tender.
June 1, 2012 Read time: 1 min
Stroitelnoe Upravlenie-820 (SU-820) has won a tender for reconstructing 11km of the M-5 Ural federal highway in Russia.

SU-820 estimated the work cost at US$103.98million (RUB 3.30bn), which was 18% less that the starting price. The reconstruction is due to be completed by late October 2014.

Five other companies including the Chelyabinsk-based (Ural) Uralmotostroy, the Omsk-based (Siberia) Mostovik, and the Saratov-based (Volga) Volgomost, took part in the tender.

Related Content

  • Colombia tunnel construction contract commencing
    February 5, 2018
    Driving work has commenced for Colombia’s Toro Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.
  • A series of key road projects are underway in Russia
    September 11, 2013
    A series of major road projects are planned for various parts of Russia that will improve connectivity. These include the Moscow-St Petersburg highway, work to the transportation system in the Rostov region and a new bridge over the Belaya River in Ufa. The tender process for the contract to build, maintain, repair, and operate a section of the Moscow- St Petersburg highway has been announced by Avtodor. The section is from the 334th to the 543th kilometre. The contract will call for the construction work t
  • Russia: MISK wins tender for Yuzhnaya Rokada construction in Moscow
    September 22, 2015
    MISK wins tender for Moscow’s Yuzhnaya Rokada road The Moscow Engineering and Construction Company (MISK) has won the tender for construction of the second section of Moscow’s Southern lateral highway. MISK was the only contractors tendering for the contract, worth nearly US$74.3 million, for the section called Yuzhnaya Rokada. Details include construction of 5km of road, essential side lanes, more than 300m of overpasses and turnoffs. Work is expected to take nearly 20 months. The tender win co
  • Delayed ring road due for completion
    May 15, 2012
    In Romania, modernisation of capital Bucharest’s ring road is now due for completion in 2012. The delay has been caused by a lack of funds. Upgrading of the sections between DN7 and DN1A and DN1A (Mogosoaia)and DN1 (Otopeni) started in 2007 and some 51km have been improved so far. The total length of the ring road will be 71km when it is complete. Tenders still have to be launched for two more sections of the ring road, the 11km DN2/A2 stretch and the 8.6km A1/DN7 section. Financing for these last section