Skip to main content

Second project for Gateway Arch restoration in Missouri, U.S.

In the U.S. state of Missouri, a second project within the US$380 million Gateway Arch grounds restoration has been given the go-ahead. Construction will start in the summer of 2013 on the initial project to put a ‘lid’ over Interstate 70, near the grounds of the Arch. The Leonor K Sullivan Boulevard, the riverfront road runs along the Mississippi River in front of the Gateway Arch, is being raised by around 0.76m. It will also be redesigned to include pedestrian and bicycle paths. Engineers working on the
February 25, 2013 Read time: 1 min
In the U.S. state of Missouri, a second project within the US$380 million Gateway Arch grounds restoration has been given the go-ahead.

Construction will start in the summer of 2013 on the initial project to put a ‘lid’ over Interstate 70, near the grounds of the Arch. The Leonor K Sullivan Boulevard, the riverfront road runs along the Mississippi River in front of the Gateway Arch, is being raised by around 0.76m. It will also be redesigned to include pedestrian and bicycle paths. Engineers working on the project's lid element, costing around $47mn, have found an estimated $11 million in savings. These savings are said to have hastened the second project: the redevelopment of the boulevard. Construction on this latter project is expected to commence in March 2014.

Related Content

  • Another US$94.08mn for repairs to Hammersmith flyover in London
    June 14, 2013
    A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • Tenders received for Mersey Gateway project
    April 10, 2013
    Tenders have now been received for the Mersey Gateway Project from all three shortlisted bidders competing to deliver the project on behalf of Halton Borough Council. The full and final tenders were delivered to the project’s offices overlooking the River Mersey ahead of the deadline. The project team and its expert advisors will now spend the next few weeks assessing the three bids. The bidding teams have spent the last 18 months working on their plans to become Halton Borough Council’s private sector par
  • Stone Arch Bridge Rehabilitation
    May 19, 2022

     

    Rehabilitating an Historic Landmark