Skip to main content

Another US$94.08mn for repairs to Hammersmith flyover in London

A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
June 14, 2013 Read time: 2 mins
A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England.

2387 Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.

The latest work will take the total spent on maintaining it to at least $109.75 million (£70mn). The latest work will be carried out by the construction and civil engineering firm 2319 Costain.

Hammersmith flyover, which carries the A4 over Hammersmith and is used by 90,000 vehicles daily, will be subject to overnight lane closures, but engineers are confident there will be no need for weight restrictions.

Only last month, Hammersmith & Fulham Council (HFC) backed an expensive ‘flyunder’ tunnel as an alternative route into London from the west, but works could cost at least $392 million (£250mn) to complete.

Speaking recently on the long-running Hammersmith flyover safety saga, HFC council leader Nick Botterill reportedly said, “We know that vital repairs are necessary to the flyover but this needs to be the last time TfL spends a huge amount of taxpayers’ money on maintaining this monstrosity. Any other cash set aside for future work to the flyover needs instead to be pumped into making the flyunder a reality.

“A new tunnel solution would dramatically improve the quality of life for thousands of west Londoners and link the riverfront with Hammersmith town centre for the first time since the 60s.”

For more information on companies in this article

Related Content

  • Race against time to fix vital flyover for 2012 Olympics
    March 21, 2012
    London faces a nail-biting race against the clock to fix Hammersmith Flyover in time for the 2012 Olympics. The flyover, which carries 90 vehicles a day on the A4, the road between central London and the West, including Heathrow airport, has been closed since 23 December after serious defects were found in the 50-year-old structure.
  • Underground tunnel could replace London’s Hammersmith flyover
    October 16, 2013
    An underground tunnel could replace the Hammersmith flyover in London, England. Plans state the structure could be built from the Hogarth roundabout to Earl's Court, replacing the existing flyover. The landmark bridge is poised for an 18-month patch-up costing €70.87 million (£60 million), but in 15-20 years will need replacing. Plans to in effect bury the heavily used flyover, which handles 90,000 vehicles each day, have been reportedly welcomed by many residents.
  • London plans major new road tunnels to give its residents a better quality of life
    September 24, 2014
    London’s transport authority, Transport for London (TfL) is considering orbital and cross-city road tunnels to help reduce pollution in the capital and create more pleasant environments for the residents of its various districts. “We believe we need to think more ambitiously,” TfL’s Michael Colella, currently lead sponsor for HS2, told the British Tunnelling Society conference in London on Wednesday. “We are looking at taking a significant part of our road traffic and in essence burying it and reusing the
  • Angry UK councils want utility companies to pay for road closures
    August 17, 2016
    An umbrella body of 370 local authorities in the UK wants towns and cities to charge utility companies for digging up roads and disrupting traffic. The Local Government Association, representing English and Welsh members says too many roads are blocked due to lane closures because of digging to repair pipes and communication lines. The LGA said it should be easier for local councils to introduce lane rental schemes if needed, without the requirement to get approval from the central government. A la