Skip to main content

Second project for Gateway Arch restoration in Missouri, U.S.

In the U.S. state of Missouri, a second project within the US$380 million Gateway Arch grounds restoration has been given the go-ahead. Construction will start in the summer of 2013 on the initial project to put a ‘lid’ over Interstate 70, near the grounds of the Arch. The Leonor K Sullivan Boulevard, the riverfront road runs along the Mississippi River in front of the Gateway Arch, is being raised by around 0.76m. It will also be redesigned to include pedestrian and bicycle paths. Engineers working on the
February 25, 2013 Read time: 1 min
In the U.S. state of Missouri, a second project within the US$380 million Gateway Arch grounds restoration has been given the go-ahead.

Construction will start in the summer of 2013 on the initial project to put a ‘lid’ over Interstate 70, near the grounds of the Arch. The Leonor K Sullivan Boulevard, the riverfront road runs along the Mississippi River in front of the Gateway Arch, is being raised by around 0.76m. It will also be redesigned to include pedestrian and bicycle paths. Engineers working on the project's lid element, costing around $47mn, have found an estimated $11 million in savings. These savings are said to have hastened the second project: the redevelopment of the boulevard. Construction on this latter project is expected to commence in March 2014.

Related Content

  • Chilean highway project faces questions
    February 14, 2012
    The plans for Chile's new Vespucio Oriente highway are under a question mark at present. The Chilean Construction Chamber (CChC) and the association of concession-holders (COPSA) have raised concerns over the plans by the country's government to press ahead with the construction of the 13km Vespucio Oriente highway in capital Santiago.
  • World’s largest bridge deck for KAIA expansion
    December 16, 2013
    A bespoke formwork solution from RMD Kwikform is playing a key role in creating the largest ever airport cast bridge deck as part of the multi-billion dollar expansion of King Abdulaziz International Airport near Jeddah, Saudi Arabia. The firm is also a leading player in the creation of arterial tunnels under the airport’s elevated roads, another key part of the project’s first phase works due for completion in 2014. Guy Woodford reports
  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.
  • Second giant moveable scaffolding system set for Mersey Gateway
    May 4, 2016
    A second movable scaffold system (MSS) is on its way from China to the UK town of Halton, as part of the Mersey Gateway Project, a toll bridge over the Mersey River in England. The machine will be used to build the south elevated approach viaduct that will connect the main road network in the town of Runcorn to the Mersey Gateway Bridge, now under construction.