Skip to main content

HCC scoops key India road build deal

The National Highways Authority of India (NHAI) has awarded a US$151.70million contract to HCC Concessions to expand the NH-8's Vadodara-Surat section into six lanes. The contract, for a 12-year concession period, includes 30 months to construct the new six-lane section. The toll-based project also includes the development of an extra-dosed bridge with four lanes across Gujarat's Narmada River.
May 4, 2012 Read time: 1 min
The 292 National Highways Authority of India (NHAI) has awarded a US$151.70million contract to HCC Concessions to expand the NH-8's Vadodara-Surat section into six lanes.

The contract, for a 12-year concession period, includes 30 months to construct the new six-lane section. The toll-based project also includes the development of an extra-dosed bridge with four lanes across Gujarat's Narmada River.

For more information on companies in this article

Related Content

  • Minister assures funds for Mumbai-Goa Highway works
    May 26, 2025
    Road improvement project should cut travel times between Mumbai and Goa by half
  • New bridge and road projects underway for Chile
    December 18, 2013
    Strong bids have been received for Chile’s Puente Industrial road bridge project, which will be built in Region VIII. Bidders included Spanish firm OHL as well as Besalco Concesiones-Concesiones Viarias Chile Tres and Sacyr Concesiones Chile. Work on the 2.5km bridge is expected to commence in 2014 and the project will cost some US$170 million to construct, with completion expected in 2017. The deal for the four lane bridge includes building access roads and involves a 30 year concession package. The Puente
  • Vinci Highways takes over TollPlus
    April 8, 2022
    The French group picked up the remaining 70% of US-based tolling software provider TollPlus.
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan