Skip to main content

Salini wins deal to build part of Poland’s S7 Expressway

Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan
August 28, 2018 Read time: 2 mins

7809 Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway.

Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (1361 GDDKiA).

Salini recently announced the sale of the plants and paving division of its US-based Lane Construction business to 3281 Eurovia for around US$555 million (€477 million).  The deal with Eurovia, part of the French concessions and construction group 5177 Vinci, will likely be finalised by the end of the year.

Salini, based in Italy, operates in 50 countries and has more than 35,000 employees. Projects include the new Gerald Desmond Bridge in Long Beach, California, in the US, as well as the new Panama Canal, the Grand Ethiopian Renaissance Dam in Ethiopia, the Cityringen metro in Copenhagen, the new Riyadh metro system.

For more information on companies in this article

Related Content

  • Salini sells paving division of Lane Construction to Eurovia
    August 28, 2018
    The transaction is subject to clearance by regulatory authorities. Closing and payment are expected in thefourth quarter of 2018. The sale is in line with Salini Impregilo’s plan to consolidate its growth strategy in large, complex infrastructure projects in the United States by exiting from non-core and non-strategic activities. With the sale, Lane Construction will continue to be one of the leading companies in the country in transport, tunnelling and water projects, with annual revenue expected at
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • Lane, part of Salini Impregilo Group, wins I-440/US 1 deal in North Carolina
    October 26, 2018
    Lane Construction, the US subsidiary of Italy’s Salini Impregilo Group, has won a US$346 million design-build contract for the Interstate I-440/US 1 in North Carolina. Lane will be making improvements to the Interstate I-440/US 1 Wake County from south of Walnut Street to north of Wade Avenue. Around 10.5km of the highway - referred to locally as the Raleigh Beltline - will be widened from four lanes to six lanes. The work involves replacing pavement and bridges and upgrading interchanges and is expected