Skip to main content

Salini wins deal to build part of Poland’s S7 Expressway

Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan
August 28, 2018 Read time: 2 mins

7809 Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway.

Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (1361 GDDKiA).

Salini recently announced the sale of the plants and paving division of its US-based Lane Construction business to 3281 Eurovia for around US$555 million (€477 million).  The deal with Eurovia, part of the French concessions and construction group 5177 Vinci, will likely be finalised by the end of the year.

Salini, based in Italy, operates in 50 countries and has more than 35,000 employees. Projects include the new Gerald Desmond Bridge in Long Beach, California, in the US, as well as the new Panama Canal, the Grand Ethiopian Renaissance Dam in Ethiopia, the Cityringen metro in Copenhagen, the new Riyadh metro system.

For more information on companies in this article

Related Content

  • Salini Impregilo expands in the US with purchase of Lane Industries
    November 12, 2015
    Italian global infrastructure group Salini Impregilo has agreed to buy 100% of Lane Industries, an American highways contractor and the “top private asphalt producer” in the US. Lane, a family-owned business based in Cheshire, Connecticut, was bought for US$406 million and has a turnover of around $1.5 billion. The company has three divisions: asphalt production, road projects and other infrastructure projects, in domestic and international markets. A statement from Salini said Lane is participating i
  • Contracts awarded for key sections of Poland’s S7 route
    June 18, 2015
    Work is starting on Poland’s S7 expressway. Italian firm Salini Impregilo is leading a consortium to construct a 21.5km stretch of the S7 expressway. The section lies between the Jedrzejow and Checiny junctions. The deal is worth nearly €144.67 million. The completion deadline is set for the third quarter of 2017. Meanwhile a consortium headed by Budimex has won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 route between Ostroda Polnoc and Ostroda Poludnie. The wo
  • Salini Impregilo morphs into Webuild
    May 19, 2020
    The name of a major player on the international construction scene has changed.
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the