Skip to main content

New bridge and road projects underway for Chile

Strong bids have been received for Chile’s Puente Industrial road bridge project, which will be built in Region VIII. Bidders included Spanish firm OHL as well as Besalco Concesiones-Concesiones Viarias Chile Tres and Sacyr Concesiones Chile. Work on the 2.5km bridge is expected to commence in 2014 and the project will cost some US$170 million to construct, with completion expected in 2017. The deal for the four lane bridge includes building access roads and involves a 30 year concession package. The Puente
December 18, 2013 Read time: 2 mins
Strong bids have been received for Chile’s Puente Industrial road bridge project, which will be built in Region VIII. Bidders included Spanish firm 980 OHL as well as 2313 Besalco Concesiones-Concesiones Viarias Chile Tres and 3959 Sacyr Concesiones Chile. Work on the 2.5km bridge is expected to commence in 2014 and the project will cost some US$170 million to construct, with completion expected in 2017. The deal for the four lane bridge includes building access roads and involves a 30 year concession package. The Puente Industrial Bridge will span the Biobío River and will link with the Ruta 160 highway and the project also includes building a rail overpass and additional drainage. When it is complete the Puente Industrial Bridge will connect Hualpén and San Pedro de la Paz and will, for a time at least, be the longest bridge in the country. When the Chacao Bridge opens in 2021, this 2.7km long structure will then become the country’s longest bridge. Chile’s public works ministry, MOP, recently accepted a proposal of $695 million to construct the bridge, which will connect Chiloé Island to the mainland. This project has been subject to a number of delays over the years and was cancelled at a previous occasion over cost concerns. However, the bridge design was assessed and the costs scaled back, with the project now definitely going ahead at last.

The 968 Chilean Government has a strong policy for infrastructure development with plans in hand to award $4.1 billion of tenders before March 2014. Spanish company 1377 Globalvia is discussing works to upgrade a 15km section of the Ruta 5 Norte highway. The $230 million contract will be split into three tenders: urban road work; the toll and traffic flow system; free-flow tolling at Lampa. The first and second contracts may be awarded to a construction company or consortium. The third contract is more specialised and will be awarded to a company with experience of this sector. The urban stretch of this project may be complete by 2016.

For more information on companies in this article

Related Content

  • Progress being made for key Chile mega projects
    February 22, 2016
    Progress is being made in Chile for two key mega projects, the Chacao Bridge and the El Melon Tunnel. Chile's Ministry of Public Works (MOP) has ordered the consortium working on the Chacao Bridge project to carry out additional studies. The consortium comprises Systra, OAS, Aas-Jakobsen and Hyundai and the project is worth US$511.45 million. The consortium has to respond to observations made by the MOP on the design proposal presented in August 2014. The works to build the bridge now look likely to continu
  • Delays have hit Chile’s Chacao Bridge project
    August 28, 2013
    Delays now look likely to affect the construction programme for Chile’s Chacao Bridge project. The US$740 million bridge project, long in planning, has been delayed on previous occasions for a number of reasons. The tolled link will connect Chiloé Island with the Chilean mainland in its Region X once complete. This 2.6km link will become South America’s largest suspension bridge although its opening will reduce journey times considerably over 25-45 minutes taken by the ferries used at present to link with C
  • Project building new Biobio bridge in Chile on track
    August 28, 2014
    Construction work on the fourth bridge spanning Chile’s Biobio Bridge is proceeding on schedule. The project site is located in Chile’s Gran Concepcion area. Construction could commence in 2016, with completion expected in 2018. Environmental studies have yet to be completed however. The work will be carried out as part of a concession package and the bridge is expected to cost some US$214 million to construct, carrying two lanes for vehicle traffic as well as claiming pedestrian and cycling connectivity. T
  • Spanish firms interested in US$740mn Chile bridge project
    June 5, 2013
    Spanish companies Sacyr, ACS and OHL will take part in three of the consortia that will bid in the US$740 million contract to build the longest suspension bridge in Chile. Works for the 2.5km Chacao Bridge, connecting the island of Chiloe and Chile's coast line, are expected to be awarded during the first quarter of 2014, with construction due to begin in 2015.