Skip to main content

Chile authorities present US$ 740mn project for Chacao bridge

Chile public authorities have presented an amended version of the Chacao bridge project, that will link Chiloe island with the mainland. Works for the 2.6km bridge will be assigned through a public competition and will cost up to US$ 740million, over US$ 200million less that the initial project presented by Puente Chiloe. The tender will be launched by the end of 2012 and should be assigned in 2013. The project is due for completion by 2019.
May 25, 2012 Read time: 1 min
Chile public authorities have presented an amended version of the Chacao bridge project, that will link Chiloe island with the mainland.

Works for the 2.6km bridge will be assigned through a public competition and will cost up to US$ 740million, over US$ 200million less that the initial project presented by Puente Chiloe. The tender will be launched by the end of 2012 and should be assigned in 2013. The project is due for completion by 2019.

Related Content

  • Interest is strong in Chile’s Chacao bridge project
    October 18, 2012
    Strong interest is being shown in the project to build the new Chacao Bridge in Chile. The country’s Ministry of Public Works has said that 41 companies have bought details of the terms and conditions for the tender to build the bridge. Around 70% of the firms interested come from outside Chile. The bridge will be located in Chiloe and is expected to cost in the region of US$740 million to construct. Chile’s Ministry of Public Works hopes that additional firms will purchase the tender details before the dea
  • New bridge and road projects underway for Chile
    December 18, 2013
    Strong bids have been received for Chile’s Puente Industrial road bridge project, which will be built in Region VIII. Bidders included Spanish firm OHL as well as Besalco Concesiones-Concesiones Viarias Chile Tres and Sacyr Concesiones Chile. Work on the 2.5km bridge is expected to commence in 2014 and the project will cost some US$170 million to construct, with completion expected in 2017. The deal for the four lane bridge includes building access roads and involves a 30 year concession package. The Puente
  • Chile’s Chacao Bridge project - futuresecured
    July 19, 2018
    Chile’s landmark Chacao Bridge project now looks to be back on a sound footing, with completion expected in late 2022 or early 2023. This projects for the 2.6km-long bridge was to have been built jointly by Brazilian firm OAS and South Korean company Hyundai. However OAS hit financial difficulties and had to withdraw from the project. As a result, Hyundai will now buy the 49% stake OAS had in the project. As Hyundai already has a 51% stake in the bridge project, this will give the firm total ownership ove
  • Chile’s major bridge construction project
    April 25, 2017
    Planning work for Chile’s Chacao Bridge project is underway at present. The new suspension bridge will provide a link to Chiloe Island and will be the longest structure of its type in Latin America when complete. Because of the risk of major earthquakes in the area, the bridge has to be constructed to cope with substantial shocks. The project is being handled by the Consorcio Puente Chacao consortium and has been in the design phase since February 2014. Chile’s Ministry for Public Works wants to ensure that