Skip to main content

Another US$94.08mn for repairs to Hammersmith flyover in London

A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
June 14, 2013 Read time: 2 mins
A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England.

2387 Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.

The latest work will take the total spent on maintaining it to at least $109.75 million (£70mn). The latest work will be carried out by the construction and civil engineering firm 2319 Costain.

Hammersmith flyover, which carries the A4 over Hammersmith and is used by 90,000 vehicles daily, will be subject to overnight lane closures, but engineers are confident there will be no need for weight restrictions.

Only last month, Hammersmith & Fulham Council (HFC) backed an expensive ‘flyunder’ tunnel as an alternative route into London from the west, but works could cost at least $392 million (£250mn) to complete.

Speaking recently on the long-running Hammersmith flyover safety saga, HFC council leader Nick Botterill reportedly said, “We know that vital repairs are necessary to the flyover but this needs to be the last time TfL spends a huge amount of taxpayers’ money on maintaining this monstrosity. Any other cash set aside for future work to the flyover needs instead to be pumped into making the flyunder a reality.

“A new tunnel solution would dramatically improve the quality of life for thousands of west Londoners and link the riverfront with Hammersmith town centre for the first time since the 60s.”

For more information on companies in this article

Related Content

  • Highways England on track with smart motorway upgrade near Cheshire
    September 28, 2018
    A 20tonne gantry – the biggest single structure under a major motorway upgrade in England - has been hoisted into place in Cheshire county.
  • Clean air solution to cut pollution
    March 2, 2017
    An innovative material is now available that could help absorb harmful airborne molecules and disperse cleaner air. The material has been developed by a team of leading Italian researchers and is being rolled-out across several European cities, including Rome and Milan. The material will be used on outdoor advertising sites in London and Italy. The launch of this material comes following a series of alarming studies warning about the dangers posed by air pollution to Londoners. Last week, a new stud
  • Improvements for UK road link
    February 27, 2023
    Improvements are planned for an important UK road link.
  • Major infrastructure plans for Gulf Region
    October 2, 2013
    Huge investment is being seen in the Gulf Region, with some US$109 billion being spent on infrastructure development according to figures from Ventures Middle East. The Gulf Co-operation Council (GCC) nations are spending on improving roads and highways. Saudi Arabia is carrying out work to build roads and bridges (as well as rail) infrastructure worth $77 billion. Meanwhile the UAE is spending $58 billion on transport infrastructure and Qatar is investing $35 billion. In addition, Oman is spending close to