Skip to main content

Highways England on track with smart motorway upgrade near Cheshire

A 20tonne gantry – the biggest single structure under a major motorway upgrade in England - has been hoisted into place in Cheshire county.
September 28, 2018 Read time: 2 mins

A 20tonne gantry – the biggest single structure under a major motorway upgrade in England - has been hoisted into place in Cheshire county.


The 40m-wide gantry spanning the width of the entire M6 motorway is to help improve the journeys of the 118,000 drivers who use the route daily. It holds 10 electronic signs as part of the €309 million upgrade of a 32km stretch of the M6 to smart motorway standard.

The 8100 Highways England scheme near the town of Knutsford involves converting the hard shoulder to a permanent extra lane and introducing variable speed limits to help tackle congestion and keep traffic flowing.

Super-span gantries are constructed off-site using a series of symmetrical steel bars and are becoming a familiar site on motorways across England.

A similar smart motorway scheme on a stretch of the M62 in West Yorkshire county, which was completed in 2013, has resulted in commuters saving an average of 30 minutes each week, said Arun Sahni, project manager at Highways England. When the scheme is complete, 258 electronic signs will have been installed to alert drivers to changes in the speed limit, lane closures and incidents ahead.

Also, 70 CCTV cameras will provide 100% coverage of the route and allow Highways England’s traffic officers and the emergency services to respond quickly to incidents. Eighteen emergency areas will be built, giving drivers a safer place to stop if they break down.

For more information on companies in this article

Related Content

  • IAM suggests confusion over UK’s SMART motorways
    April 13, 2015
    The Institute of Advanced Motorists (IAM) has expressed concern that widespread confusion exists amongst UK drivers on how best to use SMART motorways. These were officially introduced around this time in 2014 to replace Managed Motorways as the solution to the UK’s congested major routes. However concerns have been raised over the safety of the SMART motorways. England’s first all-lane running motorway, without a hard shoulder, was the 2.5km stretch of the M25 between junctions 23 and 25. Complete schemes
  • Delta Bloc solution for major upgrade to UK’s M6 motorway
    February 8, 2018
    Delta Bloc’s structural precast concrete barriers have been supplied for a €308 million smart motorway project being undertaken by Highways England on the M6 Motorway. UK contractor Charcon Construction Solutions worked with Delta Bloc UK, which develops, manufactures, supplies and installs permanent and temporary concrete road safety barriers. The Highways England scheme between junction 16 at Crewe and junction 19 at Knutsford has seen a new 32km concrete safety barrier installed in the central reservat
  • UK’s M3 motorway gets first orange smart motorway emergency area
    July 19, 2017
    The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England’s county Surrey. The redesigned emergency area has a highly visible orange road surface and better signs to help improve its visibility make it more obvious to drivers on smart motorways, according to Highways England.
  • UV lining is highway drainage first for UK motorway upgrade
    December 19, 2017
    Drainage specialist Lanes Group is implementing the first project to extensively line highway drainage pipes as part of a Smart Motorway initiative in the UK. Lanes has been commissioned by the Carillion Kier Joint Venture working for Highways England to install ultra-violet – UV - liners during the M6 Junction 16-19 Smart Motorway scheme between Crewe and Knutsford, in county Cheshire. Lanes said that it is the first time that roadside drainage pipes will have been extensively lined, instead of being