Skip to main content

Heavy Haul Across Desert

Turkish haulage operator ÇABA has been transporting huge armine absorber units at regular intervals from the Caspian Sea port of Turkmenbashi across the Karakum Desert in Turkmenistan to a flue gas desulphurisation plant in the town of Eloten.
February 17, 2012 Read time: 1 min
Turkish haulage operator ÇABA has been transporting huge armine absorber units at regular intervals from the Caspian Sea port of Turkmenbashi across the Karakum Desert in Turkmenistan to a flue gas desulphurisation plant in the town of Eloten.

The desert covers 70% of Turkmenistan, and plant operator Türkmengas is the largest gas supply company in Central Asia.

For the last 300km of the 1,300km journey, asphalt roads have been constructed to take the 600tonne load which is carried on InterCombi platform trailers with 24 axle lines from German company 2797 SCHEUERLE. An additional 12 axle lines InterCombi SL (split type) are laterally coupled. The combination, which is over 40m long, 7.5m wide and almost 7m high, is pulled and pushed by three 2796 Mercedes 8x4 2MB 3850 6x6 WSK truck tractors.

All bridges crossed on route have been fitted with special bridge crossing systems, and obstacles such as electricity pylons and road signs have to be continually removed and then re-positioned.

For more information on companies in this article

Related Content

  • New bridge under construction in Turkey
    March 28, 2014
    Work is underway on a new bridge structure in Turkey, with tower cranes playing a key role in the project The two Potain tower cranes are being used to build a 610m long cable-stayed bridge in the south-east of the country. The two cranes are MC235B models and are working 10 hours/day on the project, which is taking 30 months. The new bridge will provide an important connection across the Ataturk Dam Reservoir on the Euphrates River.
  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • Working in tandem
    August 16, 2018
    A tandem crane lift has been carried out in Kuwait on a major project in using Demag machines from Terex. The two machines have been used on the Kuwaiti government's Sheikh Jaber Al Ahmad Al Sabah Causeway Project. This 36km-long road connection is among the world's largest infrastructure projects underway at present. The project includes a 27km-long bridge over Kuwait Bay. The Kuwaiti logistics service provider Integrated Logistics Company (ILC) is carrying out key sections of the project, moving pre-a