Skip to main content

Heavy Haul Across Desert

Turkish haulage operator ÇABA has been transporting huge armine absorber units at regular intervals from the Caspian Sea port of Turkmenbashi across the Karakum Desert in Turkmenistan to a flue gas desulphurisation plant in the town of Eloten.
February 17, 2012 Read time: 1 min
Turkish haulage operator ÇABA has been transporting huge armine absorber units at regular intervals from the Caspian Sea port of Turkmenbashi across the Karakum Desert in Turkmenistan to a flue gas desulphurisation plant in the town of Eloten.

The desert covers 70% of Turkmenistan, and plant operator Türkmengas is the largest gas supply company in Central Asia.

For the last 300km of the 1,300km journey, asphalt roads have been constructed to take the 600tonne load which is carried on InterCombi platform trailers with 24 axle lines from German company 2797 SCHEUERLE. An additional 12 axle lines InterCombi SL (split type) are laterally coupled. The combination, which is over 40m long, 7.5m wide and almost 7m high, is pulled and pushed by three 2796 Mercedes 8x4 2MB 3850 6x6 WSK truck tractors.

All bridges crossed on route have been fitted with special bridge crossing systems, and obstacles such as electricity pylons and road signs have to be continually removed and then re-positioned.

For more information on companies in this article

Related Content

  • Norway’s massive Rogfast Tunnel project
    December 11, 2018
    The world's longest and deepest road tunnel is underway in western Norway - Adrian Greeman reports
  • New bridge for old Russian city
    July 30, 2012
    Murom, one of Russia's best preserved old cities, is situated in the European part of the country, around 300km to the east of Moscow. The most important industry and economic activities are mechanical engineering along with timber and textiles. The location on the River Oka, a tributary of the Volga and thus an important waterway, as well as the good connections to important main roads and rail routes, are positive economic factors. It is near Murom that German formwork and scaffolding specialist PERI is p
  • Launch soon for the Sunderland Bridge’s deck across the Wear
    March 24, 2017
    The team constructing the New Wear Crossing near the English city of Sunderland is preparing for the final launch of the 300m bridge deck. In recent weeks, the legs of the 100m-tall centrepiece have been secured to the foundations within the riverbed and most of the rigging used to raise it into place has been removed. While the bridge deck was being painted, the bottoms of both pylon legs were filled with 175tonnes of concrete, The next major process will be to slowly pull the bridge deck out acr
  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.