Skip to main content

Summer duties for T&M Bowser Solutions

T&M’s fleet consists of 4x4 bowsers that can be filled from holding ponds and 4x2 bowsers that can be filled at hydrants or static tanks on a construction site.
By David Arminas May 13, 2021 Read time: 2 mins
Spread the word: T&M has 78 bowsers ranging in capacity 3,000 to 10,000 litres (image courtesy T&M Bower Solutions)

All 78 custom-built bowsers from UK-based T&M Bowser Solutions are reported to be already on road sites in anticipation of extremely dry weather this summer.

The manufacturer of tankers said it has 32 4x4 10,000-litre capacity vacuum tankers and 46 4x2 tankers, ranging in capacity from 3,000 to 10,000 litres.

Now all 78 vehicles are now on various construction, highways and infrastructure projects, said Terry Beasley, managing director at T&M. “Dust particles can be very small—not always visible—and as tools are used, vehicles travel or as the wind picks up, this dust can circulate in the air that workers are breathing.”

T&M’s fleet of 4x4s can be used to supply water to machinery and tanks. Many have spent the winter months sucking up rainfall from sites to prevent them from flooding. However, the priority is now very much on dust suppression.

The vehicles suck water from holding ponds through a pipe with a heavy-duty strainer on the end to prevent stones being drawn upward. These versatile vehicles can also remove summer rainfall and deposit it back into holding pools.

The 4x2s, meanwhile, are filled from a hydrant or static tanks on site. They are especially useful on motorway or urban projects where tractors or heavier duty vehicles can’t be used. T&M can combine various capacities in the smaller range to suit the particular requirements of the site. The entire fleet is cab-operated while in motion, further enhancing safety and efficiency.

“Both our 4x4 and 4x2 fleets can be used full-time on larger projects, as the risk of a site being shut down due to a lack of dust control is too high given the costs incurred,” explained Beasley. “We work with our partners to ensure that they can carry on working safely even in the driest of weather.”

Related Content

  • Proper GPR Surveying Techniques
    May 10, 2019
    A sustainably good road surface often depends on how well understood is the ground underneath the road’s route. Brian Jones* offers some best practice and advice for getting the most from ground-penetrating radar investigations Ground-penetrating radar (GPR) is one of the most accurate non-destructive testing (NDT) methods available. To get the most from GPR surveying, it is absolutely essential to understand how GPR tools work and follow best practices when conducting surveys. Key areas to be aware o
  • Transylvania Motorway: route to prosperity
    July 4, 2012
    Work is progressing apace on the biggest infrastructure project in Europe, the Transylvania Motorway or Autostrada Transilvania (A3) in Romania, with completion scheduled for 2013. The four-lane, 415km motorway, stretching northwest from Brasov in central Romania, at an altitude of nearly 600m, will reach the country's northwestern border with Hungary at Oradea in Câmpia Crisanei at 130m above sea level, and will connect the cities of Brasov, Fagaras, Sighisoara, Târgu Mures, Cluj-Napoca, Zalau and Oradea.
  • Mongolia’s capital Ulaanbaatar is redeveloping its airport
    August 23, 2016
    Mongolia’s economy is growing fast, with capital Ulaanbaatar the centre for activity. Being landlocked, the country depends heavily on aviation to carry passengers and cargo. The existing Chinggis Khaan International Airport was built in 1956 and upgraded in 1987 and 1997 for international traffic. But the old airport cannot meet demands and boosting the country’s capacity to handle flights is essential. The New Ulaanbataar International Airport (NUBIA) will triple passenger capacity to approximately 3
  • ALARM Survey: UK maintenance backlog continues despite funding boost
    March 23, 2016
    Highways departments in England and Wales have yet to feel the benefit of the UK government’s commitment to spend €7.6 billion (£6 billion) on local road maintenance between 2015 and 2021. In fact, overall road budgets have dropped by 16%, according to the annual Local Authority Road Maintenance (ALARM) survey of highway bosses in England and Wales, conducted by the Asphalt Industry Alliance. This is reflected in the increase in average budget shortfalls – the difference between the money needed to ma