Skip to main content

Jetpatcher: patch it right first time

Jetpatcher Corporation says that its Jetpatcher Road Repair System is proven to reduce costs by up to 40 per cent when compared to traditional pothole repair methods.
By David Arminas March 3, 2023 Read time: 2 mins

 

Pothole problems are a major cause of traffic delays and vehicle damage, not to mention a cause of road accidents that may result in fatalities. For all these reasons, patching potholes should be a top priority for road agencies and local government in all countries.

But fixing potholes efficiently, cost effectively and making the repair as permanent as possible takes the best technology available, technology that has been proven to be effective.

Designed specifically to address pothole repairs, Jetpatcher Corporation says that the Jetpatcher system is a proven technology. It was developed in 1987 and over 900 units have been sold into more than 40 countries.

According to the company, the machine takes around two minutes to fix the average size pothole. Using the Jetpatcher, traffic can drive over the repair straight away and this is guaranteed to last a minimum of 12 months. As a result, customers have been able to increase the number of repairs they can carry out using limited budget.

Because it takes around half the repair time of other methods, the process uses significantly less energy than conventional alternatives. This why Jetpatcher’s philosophy is ‘right first time’.

In the first of the four-step method, operatives use the high-volume blower to blast all loose debris and water from the pothole; cleaning it and preparing the hole for an effective patch.

The Jetpatcher now coats the pothole with an asphalt emulsion which seals the area and prevents further damage from occurring due to moisture.

In the third step, as the aggregate passes through the nozzle it is coated with emulsion and sprayed into the hole or broken road edge. The Jetpatcher asphalt mix is sprayed at speeds of up to 100kph ensuring compaction is from the bottom up to create denser than rolled asphalt.

For the final step, the wet top of the repaired area can now be protected from traffic flow, using either dry aggregate sprayed from the Jetpatcher. Or for inner city work where loose chip is a potential hazard, sand from an  optional sand hopper can be built into the Jetpatcher unit.

For more information on companies in this article

Related Content

  • Nuphalt’s novel patching system offers fast and efficient road repairs
    September 2, 2014
    Fast, efficient and long-lasting repairs are claimed for the heating system developed by the Nu-Phalt Group Developed in the UK, the innovative Nu-Phalt pothole patching system equipment is now being widely used by various local authorities for road repairs. But this technology is also being employed internationally, with key sales in parts of Eastern Europe and India.
  • Raising global safety standards for road work zones
    November 4, 2022
    The International Road Federation is at the forefront of global efforts to raise safe work zone management practices.
  • The dark arts of asphalt production
    January 5, 2017
    Asphalt production is a complex process featuring many variables - Mike Varner, chief engineer at Astec Inc discussed methods with Mike Woof Asphalt production in a black art in more ways than one. It involves a complex process of mixing bitumen with aggregates under temperature and optimising this operation is crucial to maximise quality. But with so many variables, determining exactly what is going on inside an asphalt plant involves extensive research, sophisticated computer modelling and the use of a
  • Stimsonite Click Stud saves on in-situ replacement time
    April 29, 2015
    Over the past four years, there have been nine road worker deaths on the Highways Agency network in the UK. Statistics such as these are drivers for road authorities to improve health and safety for the workforce on the network. It takes just seconds to replace a Stimsonite Click Stud reflector compared to an average time of eight minutes to remove and replace a conventional bonded road stud. This greatly benefits the Highways Agency by reducing the exposure of road workers to traffic. Conventional