Skip to main content

Upgrade of Lánchíd Bridge by May

Four tenders in for work on Budapest’s Chain Bridge - Széchenyi Lánchíd.
By David Arminas December 23, 2020 Read time: 2 mins
Budapest Széchenyi Lánchíd Bridge upgrade to start by mid-2021 (photo © Julianelliott/Dreamstime)

Upgrade work on the Hungarian capital's Chain Bridge will be underway by May, according to Napi.hu, a Hungarian online business news portal.

The bridge, officially the cast iron suspension Széchenyi Lánchíd, was built in 1849 as the first permanent bridge across the Danube River in Hungary. Although it was designed by English engineer William Tierney Clark and built by Scottish engineer Adam Clark, it was named after István Széchenyi, a major supporter of its construction.

Four local companies have tendered for the repair work - Strabag Altalanos Epito, SDD Konzorcium, Kozgep Epito- es Femszerkezetgyarto and A-Hid Epito. A winner is expectedc to be chosen early next year.

Upgrading has been at least two-years in the planning to improve the 380m-long, 14.8m-wide bridge. Cost issues  have hampered renovation planning

At the time of construction, its centre span of 202m was one of the longest in the world. The bridge has the official name of István Széchenyi, a major supporter of its construction, although it is commonly called the Chain Bridge.

The bridge was updated and strengthened in 1914 but during World  War Two it was destroyed in January 1945 by the retreating German occupation army. It was rebuilt by 1949 and remains as one  of only two surviving two bridges designed by William Tierney Clark. The other is the suspension bridge over the Thames at Marlow, England.

Related Content

  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • Duna Aszfalt wins M44 dualing between Bekescsaba and Kondoros
    January 10, 2018
    Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros. The €133 million deal is for 18km of the M44. The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper. Békéscsaba is near the Romanian border with the M5 interchange at Kecskemét. Meanwhile, under the Rural Development Programme, the government said it will boost
  • Norway’s massive Rogfast Tunnel project
    December 11, 2018
    The world's longest and deepest road tunnel is underway in western Norway - Adrian Greeman reports
  • VIDEO: Sarens raises the pylon for New Wear Crossing in Sunderland
    February 13, 2017
    It was as weekend working in Sunderland city, northeast England, for global lifting specialist 8569 Sarens.

    Over the two days, the Belgian company gently raised a 1,550tonne steel pylon that will form the backbone of the New Wear Crossing – no official name yet – across the River Wear.

    General work on the two-span cable-stay bridge started on the bridge in May 2015. The structure will be supported by the single double pylon and will have four vehicle lanes, as well as dedicated cycle and pedestrian routes.