Skip to main content

Upgrade of Lánchíd Bridge by May

Four tenders in for work on Budapest’s Chain Bridge - Széchenyi Lánchíd.
By David Arminas December 23, 2020 Read time: 2 mins
Budapest Széchenyi Lánchíd Bridge upgrade to start by mid-2021 (photo © Julianelliott/Dreamstime)

Upgrade work on the Hungarian capital's Chain Bridge will be underway by May, according to Napi.hu, a Hungarian online business news portal.

The bridge, officially the cast iron suspension Széchenyi Lánchíd, was built in 1849 as the first permanent bridge across the Danube River in Hungary. Although it was designed by English engineer William Tierney Clark and built by Scottish engineer Adam Clark, it was named after István Széchenyi, a major supporter of its construction.

Four local companies have tendered for the repair work - Strabag Altalanos Epito, SDD Konzorcium, Kozgep Epito- es Femszerkezetgyarto and A-Hid Epito. A winner is expectedc to be chosen early next year.

Upgrading has been at least two-years in the planning to improve the 380m-long, 14.8m-wide bridge. Cost issues  have hampered renovation planning

At the time of construction, its centre span of 202m was one of the longest in the world. The bridge has the official name of István Széchenyi, a major supporter of its construction, although it is commonly called the Chain Bridge.

The bridge was updated and strengthened in 1914 but during World  War Two it was destroyed in January 1945 by the retreating German occupation army. It was rebuilt by 1949 and remains as one  of only two surviving two bridges designed by William Tierney Clark. The other is the suspension bridge over the Thames at Marlow, England.

Related Content

  • Ohio Turnpike rebuild underway at present
    September 14, 2016
    Rebuilding work is underway on the Ohio Turnpike in the US at present. This 388.3km route is being upgraded in a project worth a total of US$1.4 billion. The work is being carried out in a series of sections, with bridges in Williams County being replaced or refurbished during 2016. Resurfacing work is being carried out on the route on stretches during 2016, including sections in Sandusky County, Erie County and Lorain County. Bridge deck joint repairs are also planned in Sandusky County. Built in the pe
  • BC ramps up Highway 1, Trans-Canada, repairs
    October 19, 2022
    The Canadian province has been working hard to repair major washouts along Highway 1 – the Trans-Canada Highway – since severe flooding last November.
  • New Zezelj’s Bridge in Novi Sad symbolises brotherhood and unity
    September 7, 2018
    The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open. The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj. The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high.
  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.