Skip to main content

Plate decking complete on Széchenyi Bridge

A-Hid has been the main contractor on the 380m-long suspension bridge in Budapest, Hungary.
By David Arminas December 24, 2021 Read time: 1 min
Work on the iconic bridge in the Hungarian capital began in March (image © Tuulijumala/Dreamstime)

The last steel plate of the road deck of Budapest’s Chain Bridge has been installed as part of a major €51.1 million restoration project.

Earlier this year, contractor A-Hid trumped won a bid to become the main contractor for the work on the 380m-long, 14.8m-wide suspension Széchenyi Chain Bridge that connects Buda and Pest across the Danube River. Work on the iconic bridge in the Hungarian capital began in March and traffic has been redirected away from the bridge since June.

The bridge is named after István Széchenyi, a major supporter of its construction between 1839 and 1849. When opened, it was the first permanent bridge over the Danube River to connect both towns and had a centre span of 202m making was one of the longest in the world.

The Széchenyi Chain Bridge is one of only two surviving bridges designed by English engineer William Tierney Clark. The other is a suspension bridge in England over the River Thames at the town of Marlow, up-river from London.

For more information on companies in this article

Related Content

  • Brodno-Kysucke Nove Mesto bypass progresses
    September 22, 2022
    Metrostav was chosen to build the D3 Zilina-Kysucké Nové Mesto feeder in Brodno town.
  • Gantry design competition for English roads
    December 7, 2022
    National Highways is looking for a more streamlined and elegant appearance for its gantries.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • North Viaduct completed on UK’s Mersey Gateway bridge project
    April 19, 2017
    Concrete finishing work has started on the completed north approach viaduct of England’s new 2.13km Mersey Gateway project. Over the past three years, around 18,400m³of concrete was used to build the viaduct. When complete near the end of this year, around 60,000 vehicles are expected to use the toll bridge every day, or nearly 22 million vehicles annually.