Skip to main content

Haulotte wraps it up at Turkey’s Osman Gazi Bridge

French access group Haulotte and the Turkish access distributor and rental group Acarlar continue to contribute to major infrastructure projects in Turkey, including the new Osman Gazi Bridge. The bridge – the third Bosporus crossing - has just been completed with the installation of the last bridge deck. The bridge will reach a height of 252m and the bridge deck will be nearly 26m wide. When it soon opens, the bridge will be the fourth longest suspension bridge in the world by the length of its central
July 5, 2016 Read time: 2 mins
French access group 712 Haulotte and the Turkish access distributor and rental group Acarlar continue to contribute to major infrastructure projects in Turkey, including the new Osman Gazi Bridge.

The bridge – the third Bosporus crossing - has just been completed with the installation of the last bridge deck. The bridge will reach a height of 252m and the bridge deck will be nearly 26m wide. When it soon opens, the bridge will be the fourth longest suspension bridge in the world by the length of its central span – 1,550m.

The Osman Gazi Bridge is part of the partially completed tolled motorway Gebze-Orhangazi-İzmir Highway project, costing around US$9 billion. The 433km highway runs south from Gebze, a city about 50km east of Istanbul and on the north coast of the sea of Marmara, to the city of Bursa and then further south to the Aegean coastal city of İzmir, an industrial hub and tourist destination. It will cut the travel time between Istanbul and İzmir from nine hours to three-and-a-half. Construction started in 2013 and many of Haulotte’s electric and diesel scissors have helped build the bridge’s superstructure, such as installing and fixing steel beams. Several units of the rough terrain articulating boom HA41PX-NT were involved in the work.

Meanwhile, Haulotte recently opened a North American headquarters in the city of Virginia Beach, in the state of Virginia.

The 7,711m2 facility supports the company’s executive offices, customer sales and service support, training centre and distribution of spare parts and finished goods. Additionally, the customer care centre will oversee parts fulfillment, warehousing, pre-delivery inspections and repairs. The previous Maryland facility was roughly 1,300m2.

For more information on companies in this article

Related Content

  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year
  • Turkey mega project opening for tender
    January 12, 2017
    The tender process is commencing for a US$5 billion contract to construct a bridge and a road network of roads in Turkey. The bridge will span the Dardanelles waterway and the project looks likely to attract strong interest from several major international construction firms. The Çanakkale 1915 Bridge will be located at the western end of the Sea of Marmara, a short distance from Çanakkale. The 3.6km long bridge will feature a main span of 2.023km, making it one of the longest suspension bridges in the worl
  • Haulotte improves vertical access platform safety
    March 14, 2016
    French access manufacturer Haulotte is adding the Star6 to its vertical mast access range. The machine joins the larger Sta8 and Star10 launched last year, with new AC motors delivering smoother performance. A larger platform is included and Haulotte has added forklift slots in the side of the machine for easier movement. With three-stage hydraulic lift rams there is no requirement for chains or cables, so no regular maintenance of the lift mechanism. The Star lifts are among the first machines to feature
  • Haulotte improves vertical access platform safety
    January 6, 2017
    French access manufacturer Haulotte is adding the Star6 to its vertical mast access range. The machine joins the larger Sta8 and Star10 launched last year, with new AC motors delivering smoother performance. A larger platform is included and Haulotte has added forklift slots in the side of the machine for easier movement. With three-stage hydraulic lift rams there is no requirement for chains or cables, so no regular maintenance of the lift mechanism. The Star lifts are among the first machines to feature