Skip to main content

Ramboll appointed independent engineer on Champlain Bridge Project

Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada. Ramboll, based in Denmark, will work with the Canadian consultant Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America. Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion. “The ne
September 8, 2015 Read time: 2 mins
Proposed Champlain Bridge (artist impression)
6801 Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada.

Ramboll, based in Denmark, will work with the Canadian consultant 5346 Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America.

Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion.

“The new contract is in line with Ramboll’s strategy for North America where we are pursuing several other larger bridge and tunnel projects,” said Lars Thorbek, head of Ramboll’s department for international bridges.

World Highways reported in April that the Canadian government had awarded the multi-billion dollar contract for the Champlain Bridge, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal.

The consortium, called Signature on the Saint-Lawrence Group, includes Spanish firms 4761 Dragados Canada and ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

The project includes a new île des Soeurs Bridge along with reconstruction and widening of the federal portion of Autoroute 15. But the crown-jewel of the project is the New Champlain Bridge, a 3.4 km crossing of the main channel of the St. Lawrence River, which includes a cable stay section over the St. Lawrence Seaway.

Construction is set to begin in the summer of 2015. The New Champlain Bridge will be in service in 2018 and the rest of the corridor will be completed in 2019.

This past summer, Canada-based Canam-Bridge was chosen to fabricate the superstructure for the new bridge. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, said at the time he expects at least 45,000tonnes of steel will be required for the 3.4km bridge.

For more information on companies in this article

Related Content

  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Texas Interstate connection upgrade project
    January 31, 2018
    Consultancy firm Michael Baker International has a US$4 million contract from the Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.
  • Storstrøm Bridge JV asks for extension
    July 13, 2023
    The original estimated cost was around €280 million for the 4km cable-stay structure when the contract was awarded by the Danish Road Directorate (Vejdirektoratet).
  • Colombia’s latest bridge project
    October 12, 2018
    The new contract for Colombia’s Chirajara Bridge project has now been awarded to a consortium, Eiffage-Puentes y Torones. The consortium will handle the design and construction work for the new bridge. The structure will be a replacement for the earlier bridge, which collapsed as its construction was being finalised in January 2018, just a few months before it had been scheduled to open for traffic in March 2018. The collapse of the earlier structure resulted in 10 fatalities as well as causing serious inju