Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • Alpha 330 drilling tool system from Sandvik
    February 13, 2013
    Sandvik Construction is launching its new Alpha 330 drilling tool system for drilling and tunnelling. It has been developed with special features that control power and ensure this power is transmitted into the rock as efficiently, accurately and economically as possible. The company says that in tests, in varying rock conditions, the new design has been proven to deliver a 30-80% increase in rod life; provide more accurate collaring and straighter blast-holes, thereby delivering greater advancement and imp
  • Bauma 2016 Innovation Awards entries accepted starting today
    April 1, 2015
    Entries are now open for the bauma Innovation Awards to be presented at the international construction and construction equipment trade fair bauma in Munich in 2016. As last time, in 2016 the awards are again being presented in five categories: • Machinery • Components • Construction process/Construction work • Research • Design bauma 2016 in Munich is a major international showcase for construction machinery, building material machines, mining machines, construction vehicles and c
  • New highway linking Serbia with Albania through Kosovo planned
    February 25, 2015
    Plans are now being worked on for a new highway that will connect Serbia with Albania, running through Kosovo. The project is momentous and marks a considerable diplomatic advance, given that Serbia’s past relations with its neighbour Kosovo and Albania have been less than harmonious in the recent past. This new move is seeing a Technical Working Group comprised of experts from Albania and Serbia looking into the construction of a new highway link between the two countries, as well as new railway connection
  • Bell will push the boundaries in ADT design
    February 6, 2013
    Bell Equipment is working on its biggest ever truck, which will offer a capacity of 55tonnes. A launch date has not yet been revealed for the hauler and technical details have yet to be revealed, however the machine will have a 4x4 drive system. Marc Schürmann managing director of Bell Equipment Europe said prototype testing for the machine will commence later this year. He said “Our competitors will be the smaller class of rigid haulers,” and he added that the aim is to offer lower fuel consumption and cap