Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • France tops Eurobitume’s European bitumen consumption table
    November 20, 2017
    Among European countries, France consumed the most bitumen in 2016, using over 2.2 million tonnes of the black stuff, according to figures from Eurobitume. The recent 2016 Eurobitume Bitumen Consumption Statistics for Europe shows that bitumen consumption across all grades for Europe as a whole was 11,274 million tonnes in 2016.
  • Major Chinese bridge innovation event
    December 13, 2012
    Interest is strong in the Bridge Innovation Summit 2013 (BIS2013) being held from April 25th- 26th in Beijing, according to the event organisers. The Bridge Innovation Summit 2013 will be the leading event for bridge developments in Asia, with over 20 top executives as speakers and over 150 senior executives as participants. Confirmed leading bridge related companies and organisations include Arup, BAOSTEEL Construction, COWI, China Communications Construction Company (CCCC), China Railway Group and China’s
  • Anaconda shows off screener and conveyor
    February 26, 2013
    Anaconda Equipment International will have two products on display at its first bauma: the DF410 tracked screener and a TR60 18m track-mounted stockpiling conveyor. The DF410 entry level screener can screen and stockpile up to 250tonnes/hour of material into three sizes, and is said to be ideal for those restricted by working area in urban areas.
  • LIVE, from Leipzig, Germany: the ITF 2015 Annual Summit
    May 26, 2015
    If you couldn’t make it to Germany this year for the International Transport Forum’s Annual Summit, you can watch the live webcasts on the ITF website starting today. From this morning, Wednesday, at 11:00 Central European Time, the live webcast of the event will be available directly at this link: http://2015.internationaltransportforum.org/