Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • Terex updates compact loader
    January 6, 2017
    The latest wheeled loader from Terex – the TL120 – not only features a 16% more powerful 74.4kW Stage IIIB-compliant Deutz engine, but uses the Terex Smart Control operating system to increase fuel efficiency. The 7.1tonne machine uses a menu system similar to that found on a smartphone to configure the machine for specific applications.
  • Terex updates compact loader
    April 18, 2013
    The latest wheeled loader from Terex – the TL120 – not only features a 16% more powerful 74.4kW Stage IIIB-compliant Deutz engine, but uses the Terex Smart Control operating system to increase fuel efficiency. The 7.1tonne machine uses a menu system similar to that found on a smartphone to configure the machine for specific applications.
  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    January 6, 2017
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.
  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    February 7, 2013
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.