Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • TESMEC Group’s multi-purpose solutions
    April 9, 2013
    The design and production of high powered tracked trenchers for linear excavation and bulk excavation and surface mining is one of many areas of expertise associated with the TESMEC Group. TESMEC also designs and manufactures machines and integrated systems for the stringing and maintenance of power lines; integrated solutions for the efficiency, the management and the monitoring of power grids; machines for the stringing, maintenance and diagnostic of railway power lines; and the design and production of G
  • Improved access technology from Ruthmann
    January 6, 2017
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T
  • Improved access technology from Ruthmann
    January 31, 2013
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T
  • Top down parking in South Africa
    July 3, 2015
    Some events defy understanding, many of which happen on the road. But this accident in South Africa really puts gives the imagination a workout. Nobody was injured when a car came crashing through the roof of a small house in Durban, according to the Times Live newspaper. Click here for the report. A person was asleep in a room close to where the vehicle buried itself into the home. The driver, too, escaped and claimed he recalls going over some kind of ramp that launched the car into the air and over the