Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • HeidelbergCement investigates the binding of CO² in minerals
    August 1, 2017
    German building materials producer HeidelbergCement and Aachen2222 University of Applied Sciences are investigating the absorption of CO² from flue gas by olivine and basalt. The carbonised minerals could be used as a value-added additive in the production of building materials.
  • XCMG to create R&D base in the United States
    January 6, 2017
    Leading Chinese construction equipment manufacturing firm XCMG has revealed plans to open a new research and development facility in the United States. Speaking at bauma 2013 Wang Yansong, the company’s vice president, said, “In the second half of this year we are planning to build a R&D centre in the United States. It’ll take about half a year to finish construction. It should open in 2014.” While Yansong would not reveal how much XCMG was investing in the US site, he said it was due to America, along with
  • XCMG to create R&D base in the United States
    April 16, 2013
    Leading Chinese construction equipment manufacturing firm XCMG has revealed plans to open a new research and development facility in the United States. Speaking at bauma 2013 Wang Yansong, the company’s vice president, said, “In the second half of this year we are planning to build a R&D centre in the United States. It’ll take about half a year to finish construction. It should open in 2014.” While Yansong would not reveal how much XCMG was investing in the US site, he said it was due to America, along with
  • Challenges mount for the Fehmarn Belt Fixed Link project
    December 15, 2016
    The Fehmarn Belt Fixed Link between Danish and German islands faces ongoing delays that are pushing a construction start past this year and well into 2018. A meeting in mid-December between Danish traffic minister Ole Birk Olesen and his German counterpart Reinhard Meyer for the neighbouring German state of Schleswig-Holstein, highlighted mounting opposition against the €7 billion or more project. During the meeting, Meyer stressed that the Schleswig-Holstein government remains determined to implement