Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • Webinar - Powering ITS anywhere, anytime with solar energy solutions
    December 8, 2016
    SES America (SESA) is hosting a webinar on 15 December, dedicated to solar ITS solutions, from 1300-1400 ET, 1000-11000 PT. The webinar, Powering ITS anywhere, anytime with solar energy solutions, will discuss the seven myths about solar-powered DMS (dynamic message signs) and why the rise of solar power has paved a way for ITS. It will also discuss how to calculate an optimised solar ITS system. More information and details of how to join the webinar are on SESA’s website.
  • Dana’s TE30 extends powershift transmission offering
    January 6, 2017
    Dana Holding Corporation used bauma 2013 to reveal its Spicer TE30 powershift transmission for heavy-duty materials handling applications. With five forward and three reverse speeds, the TE30 slots into the range between the TE27 and TE32 transmissions, and is compatible with engines ranging from 225-300kW. The Spicer TE30 transmission benefits from several engineering refinements to improve efficiency. These include decreased spinning speeds of internal components to lower oil churning losses, optimised cl
  • Dana’s TE30 extends powershift transmission offering
    April 17, 2013
    Dana Holding Corporation used bauma 2013 to reveal its Spicer TE30 powershift transmission for heavy-duty materials handling applications. With five forward and three reverse speeds, the TE30 slots into the range between the TE27 and TE32 transmissions, and is compatible with engines ranging from 225-300kW. The Spicer TE30 transmission benefits from several engineering refinements to improve efficiency. These include decreased spinning speeds of internal components to lower oil churning losses, optimised cl
  • Amsterdam’s Superbelangrijk campaign aimed at cyclists who text
    February 1, 2018
    An increasing number of accidents has forced Amsterdam city to launch a safety campaign aimed at stopping mostly young cyclists from texting while riding. With a view to incoming legislation, the city of Amsterdam in cooperation with GVB (Amsterdam City Transportation) and Vervoerregio Amsterdam (Amsterdam Regional Transport) started the Superbelangrijk campaign. Literally translated as Super-important, the campaign is to educate cyclists, as well as pedestrians, of the dangers of taking your eyes off the