Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • High court drama expected at Highways UK event, NEC, Birmingham
    November 7, 2016
    What happens when a highways services employee is prosecuted for failing to follow established safety procedures? How would a courtroom drama unfold for the accused and the employer?
  • IRF Launches New Website for World Road Statistics
    April 6, 2017
    The International Road Federation Geneva Programme Centre (IRF Geneva) has been publishing the IRF World Road Statistics (WRS), the most complete and authoritative source of data for the international road, traffic and inland transport sectors for over 50 years. For 2017, IRF Geneva is pleased to announce the launch of a new website (www.worldroadstatistics.org) dedicated to the World Road Statistics. This new website provides all the information about the WRS including the methodology; contents of sections
  • International Transport Forum: public vs private policy debate
    December 4, 2014
    Simply banning cars in parts of major cities will not necessarily greatly improve the air quality over time, a new report has found. The answer for cutting carbon emissions is to get the right balance of private and public transportation along with infrastructure developed to sustain the mix, according to the International Transport Forum (ITF), a think tank within the Organisation of Economic Cooperation and Development (OECD). The ITF evaluated the potential impact of transport policies on urban carbon
  • Manitowoc increases its dealer service back-up
    January 6, 2017
    Manitowoc Crane Care is expanding its EnCORE dealer programme. Danish company UN Mobilkraner, which has worked with Manitowoc since 1994, now offers certified repair and refurbishment services for Grove mobile cranes in Scandinavia, under the Manitowoc Crane Care brand. To qualify for the program, dealers must invest considerable time in training technical staff, including advanced training for welders to earn the correct certifications for welding structural components on cranes.