Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • Manitowoc increases its dealer service back-up
    January 28, 2013
    Manitowoc Crane Care is expanding its EnCORE dealer programme. Danish company UN Mobilkraner, which has worked with Manitowoc since 1994, now offers certified repair and refurbishment services for Grove mobile cranes in Scandinavia, under the Manitowoc Crane Care brand. To qualify for the program, dealers must invest considerable time in training technical staff, including advanced training for welders to earn the correct certifications for welding structural components on cranes.
  • VIDEO: Never give a queen a lift
    May 27, 2016
    A driver in Wales drove around for a day with an estimated 20,000 unwelcome passengers until the problem got to be too evident. The video shows the car of the 65-year-old grandmother, finally parked in the small town of Haverfordwest, literally buzzing with bees. Apparently, a queen bee got stuck on the vehicle and her community decided to follow the car and stick to it as well. It took two members of the Pembrokeshire Beekeepers' Association, a park ranger and some local people to coax the travelers
  • McKinsey to present major construction sector report at bauma
    March 3, 2016
    Consultancy McKinsey and Company will launch its report Perspectives on the Construction Equipment Industry in Europe during the upcoming bauma exhibition in Munich. The report will be presented at joint seminar with the CECE – Committee for European Construction Equipment – in the bauma fairgrounds on April 13 when leading McKinsey analysts and CECE officials discuss main trends and challenges facing manufactures and buyers of equipment.
  • Dubuis’s cutting-edge crimping
    January 6, 2017
    France-based Dubuis is unveiling its new Neoelec in line BPL36 crimping tool at Intermat 2012.The company, bought by Stanley Black&Decker in 2006, has designed a crimper with 35kN force and 8mm stroke, weighing 2.1kg and capable of 4-185mm² hexagonal crimping.