Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • CTE holds dealer training at bauma
    April 19, 2013
    CTE held a successful dealer training session at bauma, aimed particularly at sharing product information including its new Zed truck-mounted articulated platforms’ variable jacking system. Other key areas of focus included the new Traccess models – which are almost ready to be presented to the market. CTE dealers were present from Russia, Slovakia, the Czech Republic, Serbia, France, England, Germany, Switzerland, Holland, Denmark, Belgium, Australia, China and the Middle East.
  • Sennebogen shows dragline at INTERMAT
    January 6, 2017
    While draglines are now a rarity, Sennebogen showed its 50tonne operating weight duty cycle crawler crane, the 650HD, with 2.33 dragline bucket. The machine is one of a 10-model range with operating weights from 20-180tonnes and engines between 119 and 708kW. It can be used in civil engineering, mining, demolition or material handling.
  • Sennebogen shows dragline at INTERMAT
    April 19, 2012
    While draglines are now a rarity, Sennebogen showed its 50tonne operating weight duty cycle crawler crane, the 650HD, with 2.33 dragline bucket. The machine is one of a 10-model range with operating weights from 20-180tonnes and engines between 119 and 708kW. It can be used in civil engineering, mining, demolition or material handling.
  • More financial doubt over proposed Fehmarn Belt Tunnel
    March 17, 2017
    The proposed Fehmarn Belt Tunnel to link Denmark and northern Germany will never be economically viable, according a report commissioned by German ferry operator Scandilines. Revenue and traffic forecasts are unrealistically high, notes the report completed by German consultancy DIW Econ. It is unlikely that the latest cost to build the massive road tunnel, around €7.4 billion, would ever be recovered. The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. Cur