Skip to main content

Consortium signs contract for section of S5 expressway in Poland

A consortium consisting of Heilit+Woerner (a subsidiary of Austrian company Strabag) and Budimex, has signed the contract to build a section of the S5 expressway between Poznań and Wrocław, Poland, with a gross value of about €138 million.
August 8, 2014 Read time: 2 mins
A consortium consisting of Heilit+Woerner and Budimex will build a section of the S5 expressway in Poland. (Photo: Jarek Ratajczak)

A consortium consisting of Heilit+Woerner (a subsidiary of Austrian company 945 Strabag) and 3302 Budimex, has signed the contract to build a section of the S5 expressway between Poznań and Wrocław, Poland, with a gross value of about €138 million.

Heilit+Woerner holds a 50% stake in the consortium, and its share in the gross value amounts to about €69 million.
Work on the expressway for the client, the General Director for National Roads and Motorways (GDDKiA) is to begin in the next few weeks and is expected to last 30 months (winter breaks not included) with completion and commissioning of the new section scheduled for 2017. It will reduce the travel time from Poznań to Wrocław by 30 minutes.

The entire new section of the S5 north of Wrocław from Korzeńsko to Widawa is some 48km long, and the contract foresees the planning and construction of the first 15km-long section from Korzeńsko that will include the construction of two interchanges at Żmigródek and Żmigród as well as access roads. The route consists of two lanes of traffic in each direction, but the width of the median strip allows for the addition of a third lane to cater for future increased traffic volume.

Under the project, the consortium will build 14 bridge structures, technical infrastructure facilities such as rain channels, gas lines and illumination as well as road passages and two rest stations. At the same time, it will also be necessary to upgrade the existing drainage network and ditches.

For more information on companies in this article

Related Content

  • Strabag wins Polish road contracts worth €170 million
    November 2, 2017
    European-based construction group Strabag, through its Polish subsidiaries, has won three road contracts from Poland’s General Directorate for National Roads and Motorways (GDDKiA). The total contract value is split among two lots along the S19 north of Warsaw for €73 million and €43 million as well as one lot along the S61 in southern Poland for €54 million. “Poland is our third most important market [and] we celebrated our 30th anniversary there,” said Thomas Birtel, chief executive of Strabag Group.
  • Polish road dispute
    March 2, 2012
    Questions are being asked in Poland over the poor performance of the recently paved S8 dual carriageway, close to capital Warsaw.
  • Poland tenders for Czestochowa A1 motorway section
    June 18, 2019
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) reports that that the three bids for the Czestochowa A1 motorway section exceed the agency’s budget. The least expensive bid was nearly €101 million, submitted by a consortium of Strabag Infrastruktura Poludnie, Budimex and Budpol. Lemar bid around €121 million while Intercor bid €159 million. GDDKiA said that the bids will not automatically be rejected. Earlier this year GDDKiA terminated its contract with Salini Polska, signed
  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T