Skip to main content

Polish road dispute

Questions are being asked in Poland over the poor performance of the recently paved S8 dual carriageway, close to capital Warsaw.
March 2, 2012 Read time: 1 min
Questions are being asked in Poland over the poor performance of the recently paved S8 dual carriageway, close to capital Warsaw. The 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) is asking the consortium that built the S8 link, which comprises, 3302 Budimex 3546 Dromex, 945 Strabag, 3544 Warbud and 3304 Mostostal Warszawa, to repair the affected section. GDDKiA has said that the asphalt density is too low and there are cracks in the road. However, the consortium has responded that the problems have arisen as the project schedule called for work to be carried out during winter, causing fast cooling of the asphalt mat, which affected compaction.

Related Content

  • New Polish highway projects are being planned
    August 11, 2014
    Plans are moving forward for two key highway projects in Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) says that the best offer for the construction of the Rzeszow - Jaroslaw section of the A4 highway has been submitted by a consortium comprising contractors Budimex and Strabag. The deal is worth some €170.63 million. Meanwhile Italian construction company Astaldi has signed a contract worth €103.23 million with GDDKiA for the S8 dual carriageway. The section of road will
  • Mostostal Warszawa makes lowest bids in Poland’s S9 tenders
    November 24, 2017
    A Mostostal Warszawa consortium has reportedly made the lowest bids to build three sections of the S19 from Nisko to Sokolow Malopolski in south-eastern Poland. The consortium’s bid was just over €187 million in total. Other bids which were received from a Strabag consortium and a Budimex consortium.
  • Polish plans progressing
    October 3, 2014
    Plans are moving forward for a series of key highway projects in Poland. One project involves constructing three sections of the new southern ring road around Polish capital Warsaw. Building the 18.5km stretch that comprises the three sections is expected to cost in the region of €1.6 billion.
  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.