Skip to main content

Work starting on second Chesapeake Tunnel project

Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, whil
September 20, 2017 Read time: 2 mins
Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, while also suffering some delays at peak periods. To increase capacity as well as to boost safety, a second bore is now being constructed and this will eliminate the need for two-way traffic as at present.


This new tunnel will be driven using a TBM with the work being carried out by the Chesapeake Tunnel Joint Venture, a partnership between the contractors 4761 Dragados and Schiavone Construction Company. This machine will use a 12.8m diameter cutter head drive a new bore under the Thimble Shoal Channel, removing some 392,000m3 of material. In all, 9,000 pre-cast segments will be used to support the new tunnel and it will have an internal diameter of 11.9m, while the project is expected to require a total of 32,900m3 of concrete. The tunnel will measure around 1.6km long and will reach a maximum depth of 41.5m, with the work due for completion in 2022.

For more information on companies in this article

Related Content

  • Second giant moveable scaffolding system set for Mersey Gateway
    May 4, 2016
    A second movable scaffold system (MSS) is on its way from China to the UK town of Halton, as part of the Mersey Gateway Project, a toll bridge over the Mersey River in England. The machine will be used to build the south elevated approach viaduct that will connect the main road network in the town of Runcorn to the Mersey Gateway Bridge, now under construction.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Chicago bypass upgrade
    May 14, 2020
    Chicago’s bypass is being widened and upgraded
  • Glasgow's new link opening
    February 28, 2012
    A new highway link is opening today in the Scottish city of Glasgow.