Skip to main content

Work starting on second Chesapeake Tunnel project

Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, whil
September 20, 2017 Read time: 2 mins
Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, while also suffering some delays at peak periods. To increase capacity as well as to boost safety, a second bore is now being constructed and this will eliminate the need for two-way traffic as at present.


This new tunnel will be driven using a TBM with the work being carried out by the Chesapeake Tunnel Joint Venture, a partnership between the contractors 4761 Dragados and Schiavone Construction Company. This machine will use a 12.8m diameter cutter head drive a new bore under the Thimble Shoal Channel, removing some 392,000m3 of material. In all, 9,000 pre-cast segments will be used to support the new tunnel and it will have an internal diameter of 11.9m, while the project is expected to require a total of 32,900m3 of concrete. The tunnel will measure around 1.6km long and will reach a maximum depth of 41.5m, with the work due for completion in 2022.

For more information on companies in this article

Related Content

  • Colombia’s longest bridge part of major project
    September 14, 2016
    Construction activity is underway on a number of key transport infrastructure projects in Colombia. A major bridge project spanning the Magdalena River is currently under construction close to the city of Barranquilla in the north of Colombia. The Pumarejo Bridge was commissioned by Instituto Nacional de Vías (INVIAS) and is being built by a consortium. Featuring a cable-stayed design, the bridge will be 2.28km in length, with three lanes for vehicles, as well as a pedestrian area and a cycle track in b
  • Date set for delayed New Zealand highway
    May 20, 2022
    The opening date has been set for a delayed New Zealand highway project.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Florida bridge upgrade underway
    March 21, 2022
    A major Florida bridge upgrade project is underway.