Skip to main content

Vinci wins stalled Strasbourg Grand Contournement Ouest deal

French construction group Vinci has been named preferred bidder for construction and operation of the previously canceled western motorway bypass in Strasbourg, northeastern France. Vinci will lead a consortium for the project estimated to need €475 million. The contract will be signed next year with construction to start in 2017, according to a report in the French newspaper Dernieres Nouvelles d’Alsace
November 12, 2015 Read time: 1 min
French construction group 5177 Vinci has been named preferred bidder for construction and operation of the previously canceled western motorway bypass in Strasbourg, northeastern France.

Vinci will lead a consortium for the project estimated to need €475 million. The contract will be signed next year with construction to start in 2017, according to a report in the French newspaper Dernieres Nouvelles d’Alsace

The win for Vinci is especially sweet because it comes two years after winning the same contract, but which was cancelled, for the 24km tolled A355 Grand Contournement Ouest, a public-private partnership deal. The plan was cancelled because of a lack of secure financing.

World Highways reported in March 2012 that the project was expected to cost up to €756 million, compared with the original estimate of €400 million quoted during the call to tender in 2009.

Construction was to have started in 2013 for opening by early 2017 at the latest.

For more information on companies in this article

Related Content

  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • Liebherr sees strong performance
    February 28, 2012
    Liebherr reports steady growth in 2010, with turnover increasing 9%, a growth in its workforce and company investments of €544.1 million.
  • Italian JV wins Denmark’s Storstrom Bridge construction deal
    October 27, 2017
    An Italian joint venture has won the construction contract for Denmark’s replacement 4km-long road and rail Storstrom Bridge. The Danish Road Directorate – Vejdirektoratet - awarded the work to contractors Itinera, Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €280 million for the 26m-wide single-support cable-stay structure. The European Union will subsidise the work to around €15 million.