Skip to main content

Vietnam bridge, road and highway development projects

Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
June 20, 2018 Read time: 2 mins
Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network.


Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Phan Thiet is being constructed through the build-operate-transfer (BOT) model. The 64km stretch from Ninh Binh to Thanh Hoa will take three years to build and is expected to cost $613 million.

Work is commencing on the $342 million Hoang Cau-Voi Phuc Road project in Hanoi. The project to build the 2.2km stretch includes two overpasses crossing the Nguyen Chi Thanh and Hoang Cau-Voi Phuc crossroads and the Giang Vo-Lang Ha and Hoang Cau-Voi Phuc crossroads.

Designs are currently being assessed for the proposed Can Gio Bridge project by the People's Committee of Ho Chi Minh City (HCMC). The bridge is intended to replace the Binh Kanh ferry link, improving connections to central Hanoi. The new bridge will span Cha River and Soai Rap River, running between Can Gio and Nha Be District and measuring 7.4km in length.

Loans worth nearly $301 million will pay for work on the Trung Luong-My Thuan Expressway project. The four banks are the Bank for Investment and Development of Vietnam (BIDV), the Vietnam Bank for Industry and Trade (VietinBank), the Vietnam Bank for Agriculture and Rural Development (Agribank) and the Vietnam Prosperity Commercial Bank (VPBank). The route is being built by contractor BOT Trung Luong-My Thuan JSC.

Other projects include highways linking La Son District with Cam Lo District, Ba Bot District with Cao Bo District as well as Nha Trang City with My Thuan 2 Bridge and Dau Giay Town.

Related Content

  • New Vietnam highway construction starting
    March 5, 2019
    Construction work is starting on Vietnam’s Van Don-Mong Cai highway. Located in Quang Ninh Province in the north east of Vietnam, the 80km highway will feature two lanes in either direction. Costing US$471.6 million, the project is expected to take nearly two years to complete. The work is being carried out in joint venture by Cong Thanh Transportation and Construction Corporation, Van Don Sun JSC and Long Van Infrastructure Investment and Development Co. The project is expected to help develop tourism in t
  • Vietnam-Cambodia expressway link gets approval
    May 5, 2017
    Construction of a new expressway is intended to improve the connection between Cambodia’s capital Phnom Penh and Vietnam’s capital, Ho Chi Minh City. This is the product of discussions between the Vietnamese and Cambodian governments. The project is expected to cost US$650 million and the new link will feature three lanes in either direction and will run alongside the existing Highway 22 in Vietnam and Highway 1 in Cambodia. The new route will feature a maximum speed of 120km/h and will stretch for 65km in
  • Hanoi’s new bridge and highway
    December 11, 2024
    Plans in hand for Hanoi’s new bridge and highway.
  • Vietnam's additional highways
    March 2, 2012
    Plans are now well in hand for two major highway projects in Vietnam.