Skip to main content

Vietnam bridge, road and highway development projects

Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
June 20, 2018 Read time: 2 mins
Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network.


Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Phan Thiet is being constructed through the build-operate-transfer (BOT) model. The 64km stretch from Ninh Binh to Thanh Hoa will take three years to build and is expected to cost $613 million.

Work is commencing on the $342 million Hoang Cau-Voi Phuc Road project in Hanoi. The project to build the 2.2km stretch includes two overpasses crossing the Nguyen Chi Thanh and Hoang Cau-Voi Phuc crossroads and the Giang Vo-Lang Ha and Hoang Cau-Voi Phuc crossroads.

Designs are currently being assessed for the proposed Can Gio Bridge project by the People's Committee of Ho Chi Minh City (HCMC). The bridge is intended to replace the Binh Kanh ferry link, improving connections to central Hanoi. The new bridge will span Cha River and Soai Rap River, running between Can Gio and Nha Be District and measuring 7.4km in length.

Loans worth nearly $301 million will pay for work on the Trung Luong-My Thuan Expressway project. The four banks are the Bank for Investment and Development of Vietnam (BIDV), the Vietnam Bank for Industry and Trade (VietinBank), the Vietnam Bank for Agriculture and Rural Development (Agribank) and the Vietnam Prosperity Commercial Bank (VPBank). The route is being built by contractor BOT Trung Luong-My Thuan JSC.

Other projects include highways linking La Son District with Cam Lo District, Ba Bot District with Cao Bo District as well as Nha Trang City with My Thuan 2 Bridge and Dau Giay Town.

Related Content

  • International interest in key Vietnam link
    April 27, 2012
    Vietnam's Transport Ministry is well on track with its plans for the design and construction of the Danang-Quang Ngai Expressway. This 139km highway will link Tuy Loan Town in Hoa Vang District of Danang and the west side of Quang Ngai City.
  • Vietnam expressway project gets go ahead
    March 11, 2017
    Approval has been given for Vietnam’s Hoa Binh-Moc Chau expressway project. The go ahead has been given by Vietnam’s Government. The project has an estimated cost of US$881 million and is planned as a public-private partnership. The construction work is expected to take 42 months and the new route will connect Hoa Binh to Moc Chau. When complete the expressway will cut the journey time between Hanoi and Moc Chau by around two hours.
  • Deo Ca to complete Vietnam tunnel road project by 2016
    November 28, 2012
    The major investor in a 13.4km tunnel road project set to link Co Ma Commune in Khanh Hoa Province and Hao Son Commune in Phu Yen Province in Vietnam has been told by a senior Government figure that the project must be completed by 2016.
  • Vietnam highway construction project facing halt
    March 5, 2020
    A Vietnam highway construction project is facing a halt to works.