Skip to main content

Uganda bridge project -financing secured

Financing now looks set to be secured for a major bridge project for Uganda. A loan is being supplied by various European and Japanese banks will help pay for the new River Nile Bridge. In all the bridge project is costing US$125.7 million. The 525m-long by 23m-wide link is needed to replace the ageing xxx structure. After the new bridge opens to traffic, the old bridge will be decommissioned.
March 26, 2018 Read time: 1 min

Financing now looks set to be secured for a major bridge project for Uganda. A loan is being supplied by various European and Japanese banks will help pay for the new River Nile Bridge. In all the bridge project is costing US$125.7 million. The 525m-long by 23m-wide link is needed to replace the ageing xxx structure. After the new bridge opens to traffic, the old bridge will be decommissioned.

Related Content

  • Oregon-Washington bridge project inching closer
    November 2, 2023
    Plans for a new Oregon-Washington bridge project are inching closer.
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports
  • New bridge to link New Jersey and Pennsylvania
    March 31, 2016
    A new tolled bridge link is planned to connect the US states of New Jersey and Pennsylvania. The structure will carry traffic on Interstate 95 and span the Delaware River. Construction work for the new bridge is expected to begin next year and take four years to complete, with the new tolled link is expected to open to traffic during 2019. The new crossing will replace the ageing Scudder’s Falls Bridge and this wider and safer structure is expected to cost around US$334 million. The toll charges have yet to
  • Myanmar bridge construction project underway
    February 18, 2019
    Construction work is underway on the new bridge spanning the Bago River in Myanmar. Much of the funding for the 1,928m bridge is being provided by the Japan International Cooperation Agency (JICA) in the form of a loan worth US$272.6 million. It is expected to cost $289 million in all to build, with completion expected in 2023. The bridge connects Thanlyin with Yangon’s Thaketa Township area and is being built just 125m from the existing bridge over the Bago River. This new cable-stayed structure will help