Skip to main content

Tunnel project for south German town to restart

Construction work is to restart on a new tunnel project in the South German town of Garmisch-Partenkirchen following the necessary approvals having been received. The town lies to the south of Munich and is a popular winter ski resort, while in summer it also experiences heavy tourist traffic as it lies on a key route between Germany and Austria, as well as Italy, lying to the south. The busy Autobahn 95 connects Munich’s southern side with Garmisch-Partenkirchen. But this route ends just to the northern si
August 5, 2019 Read time: 2 mins

Construction work is to restart on a new tunnel project in the South German town of Garmisch-Partenkirchen following the necessary approvals having been received. The town lies to the south of Munich and is a popular winter ski resort, while in summer it also experiences heavy tourist traffic as it lies on a key route between Germany and Austria, as well as Italy, lying to the south. The busy Autobahn 95 connects Munich’s southern side with Garmisch-Partenkirchen. But this route ends just to the northern side of the town, where it joins with the B2. Traffic delays are commonplace during peak periods, particularly during winter and summer holiday times.

To help alleviate the traffic issues, a 3.6km tunnel will be bored through the Kramer mountain, connecting with an additional 2km of link roads. Preparatory work on this bore commenced in 2010 but ground to a halt in 2013 due to unexpectedly high groundwater levels as well as legal challenges over environmental concerns. An Austrian contractor will now start work on the new drive in the second quarter of 2020, with completion planned for 2024 and building costs expected to hit €264 million.

Work on an additional bypass tunnel for the Partenkirchen side of the town (on the eastern side of the Partnach River) is not likely to be ready for traffic until 2030.

Related Content

  • Restart for Slovakia’s Čebrať tunnel and Hubova-to-Ivachnova D1 section
    December 13, 2017
    Work will restart on the 15.2km D1 bypass around the Slovakian town of Ružomberok after the government and contractors amended the contract. The consortium of OHL ZS and Vahostav-SK and the National Highway Company (NDS) recently signed and addendum to the contract that includes an extension of section’s Čebrať tunnel by1.6km to 3.6km and shortening of the road by around 300m. Because of continuing geological concern, NDS had earlier decided to reroute the road and the tunnel. As a result, the cost of the
  • Bavarian Autobahn bridge repairs
    March 11, 2019
    Austrian contractor STRABAG is heading a consortium that will carry out bridge upgrades on the busy A9 Autobahn connecting Nuremburg with Munich in Bavaria, southern Germany. The eight bridges between the Nuremburg/Feucht interchange and the Hipoltstein junction will be demolished and replaced with new structures. The deal is worth € 38 million and will be handled by the consortium comprising STRABAG, subdivision Bavaria North, and Ed Züblin, Subdivision Bridge Construction. The client for the project is Au
  • Massive German road investment required
    March 5, 2025
    German is requiring a massive investment in road development.
  • Boring complete for Slovakian tunnel project
    November 30, 2022
    Tunnel boring is now complete for a major Slovakian tunnel project.