Skip to main content

Strabag wins Polish road contract

Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
September 17, 2018 Read time: 2 mins
Austrian contractor 945 Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.


Strabag will hold a 92% stake in the consortium to build the link, with 3302 Budimex holding the rest of the share. Construction should start at the end of 2018 and is expected to take 32 months to complete. The project includes the construction of 16 bridges and three rest areas as well as other civils works. Strabag is already working on a design build contract for a 16km stretch of the A1 highway and will be able to carry over some of its knowledge for this latest deal.

For more information on companies in this article

Related Content

  • STRABAG wins Romanian highway project
    May 20, 2015
    Austrian contractor STRABAG is heading the consortium carrying out a highway project in Romania. The project is to build the country’s A3 highway connecting Ungheni and Ogra. Work on this 10km section of highway will take 12 months to complete. STRABAG holds the majority stake in consortium handling the €70 million contract.
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • Strabag and GBS-Infrastructure to build Sofia-Kalotina motorway
    August 2, 2018
    Austrian construction firm Strabag and Bulgarian firm GBS-Infrastructure Construction have won the contract to build the 32.4 km Sofia-Kalotina motorway. Cost of the 32.4kmn four-lane project is estimated at €120 million with completion set for 2020. The Kalotina motorway will run from the capital Sofia’s ring road to the border town of Kalotina where it will connect with Serbia’s A4 motorway. It is also part of 6,100km 10-country European route E80 running from the Portuguese capital Lisbon to the