Skip to main content

Strabag wins Polish road contract

Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
September 17, 2018 Read time: 2 mins
Austrian contractor 945 Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.


Strabag will hold a 92% stake in the consortium to build the link, with 3302 Budimex holding the rest of the share. Construction should start at the end of 2018 and is expected to take 32 months to complete. The project includes the construction of 16 bridges and three rest areas as well as other civils works. Strabag is already working on a design build contract for a 16km stretch of the A1 highway and will be able to carry over some of its knowledge for this latest deal.

For more information on companies in this article

Related Content

  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • Strabag wins Polish A1 motorway deal for Wozniki-to-Pyrzowice section
    September 2, 2015
    Strabag consortium has signed a contract for construction of a 15.2km section of the A1 motorway between Wozniki and Pyrzowice. Completion of the section that will connect Pyrzowice with Czestochowa is due by the end of 2018. It is the first of four contracts signed for construction of the motorway. Strabag’s offer is believed to be around €144 million, while the budget set by the General Directorate for National Roads and Motorways (GDDKiA), was set just over €200 million. Meanwhile, the S6 dual car
  • Contractor STRABAG is building Poland’s S8 route
    February 9, 2016
    Austrian contractor STRABAG is now working on designing and building the new S8 route in Poland. This €57 million project will provide a new 10km route connecting Radziejowice and Przeszkoda. The road is being built from concrete and is due for completion within 31 months. The project was awarded to STRABAG by Poland’s General Directorate for National Roads and Highways (GDDKiA). In addition to building the dual carriageway, the work also involves constructing the Żabia Wola junction as well as several stru
  • German highway contract for STRABAG
    August 10, 2021
    A major German highway contract will be worked on by STRABAG.