Skip to main content

Strabag wins Polish road contract

Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
September 17, 2018 Read time: 2 mins
Austrian contractor 945 Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.


Strabag will hold a 92% stake in the consortium to build the link, with 3302 Budimex holding the rest of the share. Construction should start at the end of 2018 and is expected to take 32 months to complete. The project includes the construction of 16 bridges and three rest areas as well as other civils works. Strabag is already working on a design build contract for a 16km stretch of the A1 highway and will be able to carry over some of its knowledge for this latest deal.

For more information on companies in this article

Related Content

  • A bullish Strabag adjusts upwards its 2019 outlook
    November 30, 2018
    Strabag - in a bullish mood - has adjusted upwards its 2019 outlook as it publishes its nine-month figures for 2018. We now expect the output volume to clearly exceed €15 billion and the operating EBIT margin to attain at least last year’s level of 3.3%. These forecasts lead us to anticipate another record year,” said Thomas Birtel, chief executive Strabag. Output volume was just over €11.6 billion in the first nine months of the 2018 financial year. The company statement said that this upwards moveme
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan
  • Ethiopia’s building roads
    November 29, 2013
    Ethiopia is set to benefit economically from investment in a number of new key road links totalling over US$1 billion. The east African nation’s 218km Modjo-Hassan highway is expected to cost US$720 million to construct. The highway will be constructed in two stages. The first section of the route will stretch 93km from Modjo to Zeway and is expected to cost $350 million to complete. The second section of the highway will be 125km long and link Zeway with Hewassa and this stretch is estimated to cost $370
  • Singapore road and tunnel contracts awarded
    May 29, 2018
    Contracts to construct new stretches of road and tunnels forming part of the North-South Corridor (NSC) project have been awarded by Singapore's Land Transport Authority (LTA). When complete in 2026, the NSC will improve connections between Singapore’s city centre and its northern areas. The link will be Singapore’s first integrated transport link, combining the new road connection for motor vehicles with dedicated bus lanes and cycling facilities. A contract worth close to US$603 million will be carried