Skip to main content

Slovakia’s Ruzomberok bypass and tunnel face severer delays

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years. The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová. Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern Slovakia. It lies around 260km from the Slovakian capital Bratislava.
September 4, 2017 Read time: 1 min

The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years.

The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová.

Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Slovakia Slovakia false https://en.wikipedia.org/wiki/Slovakia true false%>. It lies around 260km from the Slovakian capital %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 Bratislava Bratislava false https://en.wikipedia.org/wiki/Bratislava true false%>.

The delay has been caused by a landslide near the tunnel that is being planned through the Čebrať hills above Ružomberok. Because of continuing geological concern, the National Highway Company 5891 NDS had rerouted the road and the tunnel must now by 3.6km long, instead of only 2km, according to media reports.

For more information on companies in this article

Related Content

  • Marini’s eTOWER 2500 of strength
    April 8, 2013
    Marini’s new eTOWER 2500 asphalt plant on show at bauma 2013 is capable of producing 200tonnes/hour of asphalt. Details of the full Fayat-owned Marini brand range will also be available at the world’s biggest construction equipment show in the Fayat Group’s ‘Asphalt Pavilion’. The Pavilion, which will include touchscreen and videowall presentations, will include a special focus on Marini mobile and warm mix asphalt lines.
  • Demolition project for UK car park
    November 5, 2012
    In the UK town of Luton, a contractor has been hard at work demolishing a car park. Situated in the centre of this large town, the car park had to be removed as it had reached the end of its working life. But the tight space of the urban working environment meant that the contractor had to be extremely careful not to damage surrounding buildings or inconvenience business, traffic or commuters. Long reach excavators with demolition attachments were used by the firm.
  • Strong exhibitor support for World of Asphalt 2016
    October 16, 2015
    Strong exhibitor support has been noted for the World of Asphalt 2016 exhibition being held next year in the US state of Tennessee.
  • New trailer technology from Goldhofer
    January 6, 2017
    Transportation specialist Goldhofer is introducing a range of new semitrailer and low loader solutions. The new models include innovations in Goldhofer’s heavy-duty modules, as well as trailers and semitrailers for the construction sector. Improved payload capacities, steering performance and ride quality are all claimed. These new trailers are said to be stronger and more durable, as well as benefiting from increased versatility.