Skip to main content

Slovakia: D4/R7 Bratislava bypass work to start early this year

Construction will start early this year on 59km of highway as part of the D4/R7 bypass of the Slovakian capital Bratislava. Ferrovial through its subsidiaries Cintra Infraestructuras and Ferrovial Agroman is leading the consortium on the public-private partnerships deal worth around €1.9 billion, according to media reports. Ferrovial reached financial close on the project in June, noting that their investment would be around €975 million. The first stage of the design, build, financing, operate and ma
January 10, 2017 Read time: 2 mins
Construction will start early this year on 59km of highway as part of the D4/R7 bypass of the Slovakian capital Bratislava.

2717 Ferrovial through its subsidiaries 930 Cintra Infraestructuras and Ferrovial Agroman is leading the consortium on the public-private partnerships deal worth around €1.9 billion, according to media reports. Ferrovial reached financial close on the project in June, noting that their investment would be around €975 million.

The first stage of the design, build, financing, operate and maintain project should be completed in 2020, with the second and final stage in 2021.

The project is being funded by the European Investment Bank (EIB), EBRD and the Slovak investment group Slovensky Investicny Holding. The state will make annual payments of nearly €53million for 30 years to the operator of the motorway D4 and expressway R7.

The D4-R7 project comprises the construction of a new 27km of D4 highway, with two lanes each way, between Jarovce and Raca, creating a beltway to the east of the city and connecting the existing radial roads.

The project also includes building a 32km radial highway – the R7 – which will have two or three lanes each way, running in a south-easterly direction from the city centre.

The D4-R7 contract the first project in Slovakia for Cintra which manages over 2,100km of toll roads in 28 concessions in the Americas, Oceania and Europe. Cintra is also the largest shareholder in the 407 ETR concessionaire, around the Canadian city of Toronto, with a stake of 43.23%. The other shareholders in 407ETR are indirectly owned subsidiaries of Canada Pension Plan Investment Board (40%), and by SNC-Lavalin (16.77%).

For more information on companies in this article

Related Content

  • Property issues holding back start of work on Gordie Howe Bridge
    July 19, 2016
    Delays in buying properties in Detroit, Michigan, could hold up construction of the proposed 3.2km Gordie Howe International Bridge that will link the US city to Windsor in Canada. A report by the Detroit Free press said that around 30 of the estimated 900 parcels of land in the city’s Delray district could pose potential problems if owners resist selling the sites to the bridge’s developers. The newspaper noted that Dwight Duncan, interim chair of the Windsor-Detroit Bridge Authority - the Canadian e
  • Slovakia, Salini Impreglio to part ways over D1-Višňové tunnel work
    March 11, 2019
    Slovakia and the Italian-Slovak consortium of Salini Impregilo and Dúha will reportedly end construction of a D1 highway stretch including the Višňové tunnel. The planned 7.5km twin-tube Višňové Tunnel is part of the 13.4km section of the D1 between Lietavská Lúčka and Dubná Skala in northern Slovakia. Work started on what will be Slovakia’s longest tunnel in in June 2015. It is also part of the Corridor 5 of the Trans-European Networks (TEN) which links Bratislava with Uzhhorod in Ukraine and is financed
  • Vinci boosts stake in Confederation Bridge
    April 15, 2022
    Vinci Highways agreement to buy OMERS Infrastructure's shares in Strait Crossing Development (SCDI) will boost the French group’s stake in SCDI, the Canadian bridge's concession holder.
  • VIDEO: Nexus picks up Toowoomba bypass project in Queensland, Australia
    August 21, 2015
    Nexus Infrastructure group has signed a contract with the Australian government to deliver the Toowoomba Second Range Crossing project in Queensland state, costing nearly US$1.2 billion.

    Nexus will design construct, finance, operate and maintain the 41km route that will bypass the city of Toowoomba, east to west.

    Toowomba and district, with a population of around 158,000, is inland 125km west of Queensland's capital city Brisbane, on Australia’s northeast coast.