Skip to main content

Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway

Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.
October 20, 2017 Read time: 2 mins
Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million.


The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.

Belgrade-Sarajevo motorway will run from Pozega via Uzice to Kotroman on the border with Bosnia and Herzegovina of which Sarajevo is the capital.

The cooperation agreement was signed during the recent visit to Serbia of Turkish president Recep Erdogan. Zorana Mihajlovic, Serbia’s deputy prime minister and minister of construction, transport and infrastructure, signed a wide-ranging letter of intent with her Turkish counterpart, Ahmet Arslan to cooperate on more infrastructure projects.

“This is not the first project that Serbia is implementing together with Bosnia and Herzegovina, but it is definitely the largest one, following the construction of the Ljubovija-Bratunac bridge, the construction of a nursery and the reconstruction of the main street in Srebrenica and joint maintenance of the bridges of the Drina River,” Mihajlovic said.

Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of the former Yugoslavia, a country that dissolved into constituent parts after a brutal war in the 1990s.

Serbia has been working with Chinese firms on sections of Corridor 11 for several years.

Related Content

  • Implementation of road building projects in Russia’s Moscow may be significantly delayed
    May 15, 2014
    Implementation of some large-scale investment projects for road building in Russia’s capital Moscow may be significantly delayed A series of major documentation issues are the cause of the problem. These have delayed projects for up to nine tenders on the total sum of US$2.6 billion (95 billion rubles), with anomalies having been found by the Russian Federal Anti-Monopoly Service.
  • ERF and AVTODOR cement safety cooperation to cut casualty toll
    January 9, 2015
    One of the ERF’s principal tasks to is act as a platform for sharing best practice between countries in the field of road safety. While this activity has traditionally been handled at the European Union level, the current gloomy economic environment within Europe has forced the ERF to rethink its mandate and make the promotion of expertise a priority It is in this context that the ERF, in cooperation with the state company Russian Highways - AVTODOR - joined forces to organise a landmark event in the fie
  • Work starts on last Sofia-Kalotina section
    May 24, 2023
    Bulgaria’s A6 Europa Motorway from the capital with link up with Serbia’s A4 Motorway.
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m