Skip to main content

Work starts on last Sofia-Kalotina section

Bulgaria’s A6 Europa Motorway from the capital with link up with Serbia’s A4 Motorway.
By David Arminas May 24, 2023 Read time: 2 mins
The A6 Europa Motorway was called the A6 Kalotina Motorway until the Bulgarian government officially changed the name in 2018 (© Alexey Novikov/Dreamstime)

Bulgaria's Europe-2022 consortium has started work on the final part of the Europa Motorway, to link Sofia to the Kalotina on the border with Serbia.

The Europe-2022 consortium, which includes the Bulgarian civil engineering group Glavbolgarstroy, has the a €136.5 million contract to build the last 16.5km of what will be the nearly 65km-long A6 Europa Motorway. At the border it will connect with Serbia’s A4 Motorway.

The A6 Europa Motorway was called the A6 Kalotina Motorway until the Bulgarian government officially changed the name in 2018. It is also part of the Trans-European Transport Network (TEN-T).

Other members of the consortium include GBS-Infrastructure construction and the local company Obonato Build. Another consortium, called Europe, has been awarded a €2.86 million construction supervision contract. The investor group comprises Bulgarian companies Patinvest-Engineering, Stroynorm and R G Konsulting.

The final stretch should be ready within 18 months, according to the regional development minister Ivan Shishkov. He added that the start of the construction process had been crucial to prevent the loss of EU structural funding.

The A6 Europa Motorways includes the capital Sophia’s 13km-long Northern Bypass Highway – also called the Sofia Northern Speed Tangent. It was opened in section between 2015 and 2016.

In February, the European Commission approved an investment of more than €183 million from the Cohesion Fund for building the Kalotina-Sophia link, including the capital’s ring road.

Last June, Bulgaria awarded a design-build contract worth around €186.4 million (US$200 million) for the Shipka Peak Tunnel in the Balkan Mountain range. The tunnel will be of the north-south I-5 highway and run under Shipka Peak, rising 1329m above sea level in the Bulgaria’s Balkan Mountains and within Bulgarka Nature Park. I-5 follows European route E85 from Ruse to Haskovo.

Related Content

  • Bulgaria signs Shipka Pass deal
    June 17, 2022
    The PSVT consortium picked up the Shipka Pass Tunnel project as part of the bypass for Gabrovo City, a town of around 50,000 situated on the Yantra River.
  • Strabag and GBS-Infrastructure to build Sofia-Kalotina motorway
    August 2, 2018
    Austrian construction firm Strabag and Bulgarian firm GBS-Infrastructure Construction have won the contract to build the 32.4 km Sofia-Kalotina motorway. Cost of the 32.4kmn four-lane project is estimated at €120 million with completion set for 2020. The Kalotina motorway will run from the capital Sofia’s ring road to the border town of Kalotina where it will connect with Serbia’s A4 motorway. It is also part of 6,100km 10-country European route E80 running from the Portuguese capital Lisbon to the
  • Bulgarian highway deal awarded
    February 7, 2022
    A key Bulgarian highway deal has been awarded.
  • Bulgaria breaks ground for Martisa River bridge
    August 23, 2023
    The contract was awarded to local engineering firm GBS-Infrastructure Construction in Plovdiv, a subsidiary of the Bulgarian civil engineering group Glavbolgarstroy.