Skip to main content

Work starts on last Sofia-Kalotina section

Bulgaria’s A6 Europa Motorway from the capital with link up with Serbia’s A4 Motorway.
By David Arminas May 24, 2023 Read time: 2 mins
The A6 Europa Motorway was called the A6 Kalotina Motorway until the Bulgarian government officially changed the name in 2018 (© Alexey Novikov/Dreamstime)

Bulgaria's Europe-2022 consortium has started work on the final part of the Europa Motorway, to link Sofia to the Kalotina on the border with Serbia.

The Europe-2022 consortium, which includes the Bulgarian civil engineering group Glavbolgarstroy, has the a €136.5 million contract to build the last 16.5km of what will be the nearly 65km-long A6 Europa Motorway. At the border it will connect with Serbia’s A4 Motorway.

The A6 Europa Motorway was called the A6 Kalotina Motorway until the Bulgarian government officially changed the name in 2018. It is also part of the Trans-European Transport Network (TEN-T).

Other members of the consortium include GBS-Infrastructure construction and the local company Obonato Build. Another consortium, called Europe, has been awarded a €2.86 million construction supervision contract. The investor group comprises Bulgarian companies Patinvest-Engineering, Stroynorm and R G Konsulting.

The final stretch should be ready within 18 months, according to the regional development minister Ivan Shishkov. He added that the start of the construction process had been crucial to prevent the loss of EU structural funding.

The A6 Europa Motorways includes the capital Sophia’s 13km-long Northern Bypass Highway – also called the Sofia Northern Speed Tangent. It was opened in section between 2015 and 2016.

In February, the European Commission approved an investment of more than €183 million from the Cohesion Fund for building the Kalotina-Sophia link, including the capital’s ring road.

Last June, Bulgaria awarded a design-build contract worth around €186.4 million (US$200 million) for the Shipka Peak Tunnel in the Balkan Mountain range. The tunnel will be of the north-south I-5 highway and run under Shipka Peak, rising 1329m above sea level in the Bulgaria’s Balkan Mountains and within Bulgarka Nature Park. I-5 follows European route E85 from Ruse to Haskovo.

Related Content

  • Sofia to Belgrade in three hours
    June 15, 2020
    Serbia and neighbouring Bulgaria are hoping to agree a motorway project.
  • Bulgaria plans for operating road infrastructure
    February 21, 2012
    There is a lot of work to do on Bulgarian roads, but the government has plans to increase the length of highways built each year as Krasimir Krastanov reports. Bulgarian roads with a pavement make up 98.4% of all the country's roads, while 92.5% of them have an asphalt surface and 82.8% of them are able to carry 10tonnes/axle.
  • Work to start on section of Bulgaria’s controversial Struma road
    August 19, 2016
    Work will start next month on a 24km section of Bulgaria’s controversial Struma Highway, part of the the Pan-European Corridor IV. Corridor IV runs from Dresden in Germany to Istanbul in western Turkey. The route, named after the Struma River, is part of Е79 that runs from Miskolc in Hungary to the Greek Aegean port of Thessaloniki, passing through the Romanian cities of Deva and Craiova. The 156km route has been under construction in four sections, with work on the third and final section now abou
  • EBRD mulls loan for Macedonian Corridor 8 work
    July 13, 2021
    The €110million (US$ 130.5 million) load would help construct a 10.7km section, including a tunnel, between Bukojcani and Kicevo.