Skip to main content

Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway

Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.
October 20, 2017 Read time: 2 mins
Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million.


The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.

Belgrade-Sarajevo motorway will run from Pozega via Uzice to Kotroman on the border with Bosnia and Herzegovina of which Sarajevo is the capital.

The cooperation agreement was signed during the recent visit to Serbia of Turkish president Recep Erdogan. Zorana Mihajlovic, Serbia’s deputy prime minister and minister of construction, transport and infrastructure, signed a wide-ranging letter of intent with her Turkish counterpart, Ahmet Arslan to cooperate on more infrastructure projects.

“This is not the first project that Serbia is implementing together with Bosnia and Herzegovina, but it is definitely the largest one, following the construction of the Ljubovija-Bratunac bridge, the construction of a nursery and the reconstruction of the main street in Srebrenica and joint maintenance of the bridges of the Drina River,” Mihajlovic said.

Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of the former Yugoslavia, a country that dissolved into constituent parts after a brutal war in the 1990s.

Serbia has been working with Chinese firms on sections of Corridor 11 for several years.

Related Content

  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • Serbia sets €7.12 billion transport budget
    February 2, 2024
    Serbia is setting a €7.12 billion transport budget.
  • Challenging Serbian highway project being built
    June 24, 2021
    Construction work is underway on a challenging Serbian highway project.
  • Golden opportunities in the MINT - Mexico, Indonesia, Nigeria, Turkey
    May 21, 2015
    Mexico, Indonesia, Nigeria, Turkey – Global Report offers up some food for thought about where smart money might be headed within the next several years – David Arminas writes China’s rate of growth may be slowing down, but other South East Asian companies are being quick to offer alternate investment opportunities, notably Indonesia. Nigeria, too, has had issues with security of investment. But there are signs that the government may be getting serious at last about tightening up rules and regulation